FE Civil Review Manual
Study notes, formula summaries and worked problems.
Chapter 1 · approx. 6–9%
Surveying
Overview
Surveying measures distances, angles and elevations to locate points and compute areas and volumes. FE problems are short computations: leveling arithmetic, bearing and azimuth conversions, traverse closure, horizontal and vertical curves, and areas by coordinates. Learn the definitions precisely.
1. Leveling
Differential leveling transfers elevation with a level and rod.
A backsight (BS) is a reading on a point of known elevation; a foresight (FS) is a reading on a new point. A turning point links one instrument setup to the next.
Level run
Given: BM elevation 100.00 ft. Readings: BS 5.20 on the BM, FS 3.80 on turning point TP1, BS 4.10 on TP1, FS 6.30 on point A.
Solution: HI₁ = 105.20; TP1 = 101.40. HI₂ = 101.40 + 4.10 = 105.50; A = 105.50 − 6.30 = 99.20 ft.
Check a level run by closing back on the starting benchmark; the misclosure should be small compared with the allowable error, which scales with the square root of the distance.
2. Directions: azimuth and bearing
An azimuth is measured clockwise from north, 0° to 360°. A bearing is an acute angle from north or south toward east or west. Convert by quadrant:
| Quadrant | Azimuth from bearing |
|---|---|
| NE | bearing |
| SE | 180° − bearing |
| SW | 180° + bearing |
| NW | 360° − bearing |
The back azimuth is the azimuth ± 180°. The interior angles of a closed n-sided polygon sum to (n − 2)·180°.
3. Traverse computations
For a course of length L and azimuth A:
For a closed traverse the sums of latitudes and departures should be zero. The leftovers give the linear error of closure and the relative precision:
The compass rule distributes errors in proportion to course length: correction = −(error)(course length)/(perimeter).
Compass rule
Given: the total latitude error is +0.40 ft and the perimeter is 2,000 ft. Find the latitude correction for a 500 ft course.
Solution: correction = −0.40(500/2000) = −0.10 ft.
4. Area by coordinates
List the corners in order around the parcel, repeat the first at the end, multiply and subtract. The result is independent of where the origin is placed.
5. Horizontal curves
A simple circular curve is defined by its radius R and deflection angle Δ.
Using the arc definition the degree of curve is D = 5729.58/R. Stationing: PC = PI − T and PT = PC + L.
Circular curve
Given: R = 1,000 ft, Δ = 30°.
Solution: T = 1000 tan 15° = 267.95 ft. L = 1000(0.5236) = 523.6 ft. LC = 2000 sin 15° = 517.6 ft. E = 1000(sec 15° − 1) = 35.3 ft.
If the PI is at station 25+00, then PC = 2500 − 267.95 = 22+32.05 and PT = 22+32.05 + 523.6 = 27+55.65.
6. Vertical curves
A parabolic curve joins two grades g₁ and g₂ (in percent). The algebraic difference is A = |g₂ − g₁|.
The high or low point is at x = g₁L/(g₁ − g₂) from the PVC when the grades have opposite signs. Larger K means a flatter curve; K is set by design speed and sight distance.
High point
Given: g₁ = +3%, g₂ = −2%, L = 500 ft.
Solution: A = 5, K = 100 ft per percent. High point at x = 0.03(500)/(0.03 + 0.02) = 300 ft from the PVC.
7. Earthwork volumes
Average end area: V = L (A₁ + A₂)/2. Convert cubic feet to cubic yards by dividing by 27. The prismoidal formula is more accurate: V = L (A₁ + 4A_m + A₂)/6, where A_m is the area at the midpoint.
8. Measurement errors
Random errors average out and follow √n behaviour; systematic errors (tape too long, instrument out of adjustment) accumulate and must be corrected. A tape standardized at 68 °F that is used at a higher temperature is too long, so the temperature correction is added.
Common mistakes
- Subtracting the backsight instead of adding it when computing HI.
- Forgetting to convert quadrant bearings to azimuths before computing latitudes.
- Using degrees where radians are required for L = RΔ.
- Omitting the closing coordinate pair in the area formula.
- Forgetting to divide by 27 for cubic yards.
Exam strategy
Draw a sketch for every directional problem. For curves, list R, Δ, T, L, PC and PT in order. Use the vertical-curve elevation equation, and sanity-check that the curve elevation lies between the two tangents.
Checklist
- [ ] I can run and check a differential level.
- [ ] I can convert between bearings and azimuths.
- [ ] I can compute traverse closure and apply the compass rule.
- [ ] I can find horizontal curve elements and stationing.
- [ ] I can find vertical curve elevations and high and low points.
Formula summary
- Height of instrument
- HI = Elev + BS; Elev_new = HI − FS
- Interior angle sum
- Σ = (n − 2) · 180°
- Curve tangent
- T = R tan(Δ/2)
- Curve length
- L = R Δ (radians)
- Long chord
- LC = 2R sin(Δ/2)
- Vertical curve K
- K = L / A
- Average end area
- V = L (A₁ + A₂) / 2
Worked problems
1. A benchmark has elevation 100.00 ft. A backsight on it reads 4.50 ft, and a foresight to a new point reads 6.20 ft. The new point’s elevation is:
- 98.30 ft
- 101.70 ft
- 102.30 ft
- 110.70 ft
Answer: A. HI = 100.00 + 4.50 = 104.50. Elevation = HI − FS = 104.50 − 6.20 = 98.30 ft.
2. The sum of the interior angles of a closed five-sided traverse is:
- 360°
- 450°
- 540°
- 720°
Answer: C. (n − 2)(180°) = 3(180°) = 540°.
3. A circular curve has R = 1,000 ft and Δ = 30°. The tangent length T is closest to:
- 134 ft
- 268 ft
- 524 ft
- 1,000 ft
Answer: B. T = R tan(Δ/2) = 1000 tan 15° = 1000(0.2679) = 268 ft.
4. For the same curve (R = 1,000 ft, Δ = 30°), the curve length L is closest to:
- 268 ft
- 500 ft
- 524 ft
- 1,047 ft
Answer: C. L = RΔ = 1000(30π/180) = 523.6 ft.
5. A parcel has corners (0, 0), (100, 0), (80, 50) and (0, 50) in feet. Its area by the coordinate method is:
- 4,000 ft²
- 4,500 ft²
- 5,000 ft²
- 9,000 ft²
Answer: B. Σ(xᵢyᵢ₊₁ − xᵢ₊₁yᵢ) = 0 + 5000 + 4000 + 0 = 9000; area = 9000/2 = 4,500 ft². (Check: trapezoid, average width 90 ft × 50 ft.)
6. A line has bearing S 60° W. Its azimuth from north is:
- 120°
- 210°
- 240°
- 300°
Answer: C. South-west quadrant: azimuth = 180° + 60° = 240°.
7. A symmetric vertical curve is 600 ft long and joins a +3% grade to a −3% grade. The K value is:
- 50 ft/%
- 100 ft/%
- 200 ft/%
- 300 ft/%
Answer: B. A = |−3 − 3| = 6%. K = L/A = 600/6 = 100 ft per %.
8. End areas of 200 ft² and 300 ft² occur 100 ft apart. The earthwork volume by average end area is closest to:
- 463 yd³
- 926 yd³
- 1,111 yd³
- 2,500 yd³
Answer: B. V = 100(200 + 300)/2 = 25,000 ft³ ÷ 27 = 926 yd³.
9. A closed traverse has ΣLatitudes = +0.30 ft, ΣDepartures = −0.40 ft and a perimeter of 5,000 ft. The relative precision of closure is:
- 1:5,000
- 1:10,000
- 1:12,500
- 1:20,000
Answer: B. Linear error = √(0.30² + 0.40²) = 0.50 ft. Precision = 0.50/5,000 = 1/10,000.
10. A 400 ft traverse course has bearing N 30° E. Its departure is:
- 200 ft E
- 346 ft E
- 400 ft E
- 173 ft E
Answer: A. Departure = L sin(bearing) = 400 sin30° = 200 ft east. (Latitude = 400 cos30° = 346 ft north.)
11. Using the arc definition, D = 5,729.58/R. A curve with R = 1,146 ft has a degree of curve of:
- 2.5°
- 5.0°
- 10.0°
- 20.0°
Answer: B. D = 5729.58/1146 = 5.0°.
12. A curve has its PI at station 25+00, T = 268 ft and L = 523.6 ft. The PT station is closest to:
- 27+55.6
- 27+68
- 25+00
- 22+32
Answer: A. PC = 2500 − 268 = 22+32. PT = PC + L = 2232 + 523.6 = 27+55.6.
13. A parabolic vertical curve 500 ft long starts at the PVC (elev. 100.00 ft) with g₁ = +2% and g₂ = −3%. The elevation 250 ft from the PVC is:
- 105.00 ft
- 101.88 ft
- 98.13 ft
- 103.13 ft
Answer: B. y = 100 + 0.02(250) + [(−0.05)/(2 × 500)](250²) = 100 + 5 − 3.125 = 101.88 ft.
14. A steel tape standardized at 68 °F measures 500.00 ft at 95 °F (α = 6.45×10⁻⁶ per °F). The temperature correction is:
- +0.087 ft
- −0.087 ft
- +0.019 ft
- +0.500 ft
Answer: A. C = αL(T − T₀) = 6.45×10⁻⁶(500)(27) = +0.087 ft. The warm tape is too long, so the true distance is greater.
15. A transit measures a horizontal distance of 300 ft to a point at a vertical angle of +5°. The elevation difference is closest to:
- 13.1 ft
- 26.2 ft
- 300 ft
- 301 ft
Answer: B. Δh = 300 tan5° = 300(0.0875) = 26.2 ft.
16. The forward azimuth of a line is 205°. Its back azimuth is:
- 25°
- 115°
- 155°
- 385°
Answer: A. Back azimuth = forward − 180° = 25°.
Chapter 2 · approx. 10–15% (with Environmental)
Hydrology & Hydraulics
Overview
Hydrology estimates how much water a storm produces; hydraulics describes how it moves in pipes and channels. FE questions pair the two: compute a design flow with the rational or curve-number method, then size a channel or check a pipe. This guide follows that sequence.
1. Rainfall and runoff
Design rainfall comes from an intensity–duration–frequency (IDF) curve; the storm duration normally equals the time of concentration, the time for runoff from the most remote point to reach the outlet.
Rational method
For small catchments (under roughly 200 acres):
C is the runoff coefficient (paved about 0.9, lawns about 0.2–0.3). For mixed land use take the area-weighted average.
Composite runoff coefficient
Given: 10 acres of pavement (C = 0.9) and 30 acres of lawn (C = 0.3), i = 3 in/hr.
Solution: C = (10 × 0.9 + 30 × 0.3)/40 = 0.45. Q = 0.45(3)(40) = 54 cfs.
SCS curve-number method
Curve-number runoff
Given: CN = 80 and a 4 in storm.
Solution: S = 2.5 in and 0.2S = 0.5 in. Q = (3.5)²/(4 + 2.0) = 2.04 in of runoff.
Volume: 1 acre-ft = 43,560 ft³, so 50 acres with 2 in of runoff is 50 × 2/12 = 8.33 acre-ft.
2. Storage and routing
A detention pond reduces peak flow by storing the difference between inflow and outflow: ΔStorage = (Inflow − Outflow) × time.
Pond storage
Given: a pond receives 5 cfs and releases 3 cfs for 24 hours.
Solution: 2 cfs × 86,400 s = 172,800 ft³ = 3.97 acre-ft.
3. Open-channel flow
Manning's equation gives uniform flow velocity:
R = A/P is the hydraulic radius and Q = VA. Typical n values: smooth concrete 0.013, earth channel 0.02–0.025, natural streams 0.03–0.05.
Manning's equation
Given: a rectangular channel 2 m wide and 1 m deep, n = 0.013, S = 0.001.
Solution: A = 2 m², P = 4 m, R = 0.5 m. V = (1/0.013)(0.5)^(2/3)(0.001)^(1/2) = 1.53 m/s, so Q = 3.06 m³/s.
Specific energy and flow regime
For a rectangular channel with discharge per unit width q: critical depth y_c = (q²/g)^(1/3) and E_c = 1.5 y_c. The Froude number Fr = v/√(g y) separates subcritical (Fr < 1, deep slow flow) from supercritical (Fr > 1, shallow fast flow).
Critical depth
Given: q = 3 m²/s.
Solution: y_c = (9/9.81)^(1/3) = 0.97 m.
Hydraulic jump
Supercritical flow changing to subcritical flow produces a jump with energy loss. For a rectangular channel the sequent depth is:
Hydraulic jump
Given: y₁ = 0.5 m, v₁ = 6 m/s.
Solution: Fr₁ = 6/√(9.81 × 0.5) = 2.71. y₂ = 0.25[√(1 + 8 × 7.34) − 1] = 1.68 m.
4. Weirs and orifices
Sharp-crested rectangular weir: Q = 3.33 L H^(3/2) (US, cfs) or Q = 1.84 L H^(3/2) (SI). Orifice: Q = C_d A √(2gh). Always check that you are using the head measured above the crest or the center of the orifice.
5. Pressure pipe flow
Continuity Q = Av and the energy equation with head loss h_L govern pipe systems. Hazen–Williams (US) is common for water mains:
Hazen–Williams velocity
Given: a 1 ft diameter pipe flowing full, C = 120, S = 0.01.
Solution: R = D/4 = 0.25 ft. V = 1.318(120)(0.25)^0.63(0.01)^0.54 = 5.5 ft/s.
A pressure of 1 psi equals 2.31 ft of water, so 40 psi is 92.4 ft of head.
6. Groundwater
Darcy's law: Q = K i A, with hydraulic gradient i = Δh/L and K the hydraulic conductivity. Transmissivity T = K b for a confined aquifer of thickness b. Darcy velocity is a flux; the actual pore velocity is higher by the factor 1/n (porosity).
Common mistakes
- Using the SI Manning equation with US numbers (1.49 versus 1.0).
- Using the full area rather than the wetted perimeter to compute R.
- Forgetting to convert inches to feet when finding volumes.
- Using the rational method for watersheds that are too large.
- Mixing up subcritical and supercritical regimes.
Exam strategy
Decide first whether the question is hydrology (flow estimate), open channel (Manning, Froude) or pipe (continuity, energy). Write the units next to each number, and compute Fr whenever depth and velocity are both known.
Checklist
- [ ] I can estimate peak flow with the rational method and runoff with CN.
- [ ] I can compute channel velocity and flow with Manning's equation.
- [ ] I can find critical depth, Froude number and the sequent depth of a jump.
- [ ] I can use weir, orifice and Hazen–Williams equations.
- [ ] I can apply Darcy's law.
Formula summary
- Rational method
- Q = C i A
- SCS storage
- S = 1000/CN − 10
- SCS runoff
- Q = (P − 0.2S)² / (P + 0.8S)
- Manning (SI)
- V = (1/n) R^(2/3) S^(1/2)
- Critical depth (rect.)
- y_c = (q²/g)^(1/3)
- Darcy
- Q = K i A
Worked problems
1. A 10-acre site has C = 0.8 and design intensity 3 in/hr. The peak runoff is:
- 2.4 cfs
- 8 cfs
- 24 cfs
- 240 cfs
Answer: C. Q = CiA = 0.8 × 3 × 10 = 24 cfs.
2. A watershed has CN = 80 and receives P = 4 in of rain. Using the SCS method, the runoff depth is closest to:
- 1.5 in
- 2.0 in
- 2.5 in
- 3.5 in
Answer: B. S = 1000/80 − 10 = 2.5 in; 0.2S = 0.5. Q = (4 − 0.5)²/(4 + 2.0) = 12.25/6 = 2.04 in.
3. A rectangular channel is 2 m wide, flows 1 m deep, n = 0.013 and S = 0.001. The velocity is closest to:
- 0.8 m/s
- 1.5 m/s
- 2.4 m/s
- 3.1 m/s
Answer: B. R = 2/4 = 0.5 m. V = (1/0.013)(0.5)^(2/3)(0.001)^(1/2) = 76.9(0.630)(0.0316) = 1.53 m/s.
4. The discharge in that channel (A = 2 m², V = 1.53 m/s) is closest to:
- 1.5 m³/s
- 3.1 m³/s
- 4.6 m³/s
- 6.1 m³/s
Answer: B. Q = AV = 2(1.53) = 3.06 m³/s.
5. A wide rectangular channel carries q = 3 m²/s. The critical depth is closest to:
- 0.49 m
- 0.97 m
- 1.5 m
- 3.0 m
Answer: B. y_c = (q²/g)^(1/3) = (9/9.81)^(1/3) = 0.97 m.
6. An aquifer has K = 1×10⁻³ m/s, a gradient of 0.01 and a flow area of 50 m². The discharge is:
- 5×10⁻⁶ m³/s
- 5×10⁻⁴ m³/s
- 5×10⁻² m³/s
- 0.5 m³/s
Answer: B. Q = KiA = (10⁻³)(0.01)(50) = 5×10⁻⁴ m³/s (0.5 L/s).
7. At critical depth in an open channel, the Froude number is:
- 0
- 0.5
- 1.0
- 2.0
Answer: C. Fr = 1 at critical flow; below 1 is subcritical, above 1 supercritical.
8. A full circular concrete pipe, D = 2 ft, n = 0.013 and S = 0.005, flows full. Using Manning’s equation (US units), the discharge is closest to:
- 8.0 cfs
- 12.5 cfs
- 16.0 cfs
- 20.4 cfs
Answer: C. R = D/4 = 0.5 ft; V = (1.49/0.013)(0.5)^(2/3)(0.005)^(1/2) = 5.10 ft/s. A = π ft², Q = 16.0 cfs.
9. Water discharges through a 0.1 m diameter sharp-edged orifice under 4 m of head, with C_d = 0.6. The flow is closest to:
- 4.2 L/s
- 25 L/s
- 41.7 L/s
- 69.6 L/s
Answer: C. Q = C_d A √(2gh) = 0.6(0.007854)(8.859) = 0.0417 m³/s = 41.7 L/s.
10. A 40-acre watershed has 10 acres of pavement (C = 0.9) and 30 acres of lawn (C = 0.3). The composite runoff coefficient is:
- 0.30
- 0.45
- 0.60
- 0.90
Answer: B. C = (10 × 0.9 + 30 × 0.3)/40 = 18/40 = 0.45.
11. An open channel carries water 2.0 m deep at 3.0 m/s. The specific energy is closest to:
- 2.00 m
- 2.46 m
- 2.92 m
- 4.50 m
Answer: B. E = y + V²/2g = 2.0 + 9/19.62 = 2.46 m.
12. A suppressed rectangular weir (L = 3 m, H = 0.5 m) uses Q = 1.84 L H^(3/2). The flow is closest to:
- 0.55 m³/s
- 0.92 m³/s
- 1.95 m³/s
- 2.76 m³/s
Answer: C. Q = 1.84(3)(0.5)^1.5 = 1.84(3)(0.3536) = 1.95 m³/s.
13. A pond receives 5 cfs and releases 3 cfs for 24 hours. The storage increase is closest to:
- 1.98 ac-ft
- 3.97 ac-ft
- 7.9 ac-ft
- 172.8 ac-ft
Answer: B. 2 cfs × 86,400 s = 172,800 ft³ ÷ 43,560 = 3.97 ac-ft.
14. A confined aquifer has K = 50 ft/day and thickness b = 40 ft. The transmissivity is:
- 90 ft²/day
- 1.25 ft²/day
- 2,000 ft²/day
- 20,000 ft²/day
Answer: C. T = Kb = 50 × 40 = 2,000 ft²/day.
15. A pressure of 40 psi in a water main is equivalent to a head of closest to:
- 17 ft
- 40 ft
- 92 ft
- 185 ft
Answer: C. 1 psi = 2.31 ft of water, so 40 psi = 92.4 ft.
Chapter 3 · approx. 10–15% (with Hydrology)
Environmental Engineering
Overview
Environmental engineering for the FE covers water quality, treatment of drinking water and wastewater, air pollution, solid and hazardous waste, and simple mass balances. The calculations are short; the main task is remembering the treatment sequence and the correct unit conversions.
1. Water quality parameters
| Parameter | Meaning |
|---|---|
| DO | dissolved oxygen, needed by aquatic life |
| BOD | oxygen used by microbes to decompose organic matter |
| COD | oxygen needed to chemically oxidize all organics |
| pH | −log[H⁺]; neutral is 7 at 25 °C |
| Alkalinity | capacity to neutralize acid (mostly bicarbonate) |
| Hardness | Ca²⁺ and Mg²⁺, expressed as mg/L as CaCO₃ |
| Turbidity | cloudiness from suspended particles |
Hardness conversion: mg/L as CaCO₃ = mg/L ion × 50/(equivalent weight). Calcium has an equivalent weight of 20, so 80 mg/L Ca is 200 mg/L as CaCO₃.
2. BOD and oxygen demand
The oxygen demand exerted by time t follows first-order kinetics:
Five-day BOD
Given: L₀ = 300 mg/L and k = 0.23 day⁻¹ (base e).
Solution: BOD₅ = 300(1 − e^(−1.15)) = 300(1 − 0.3166) = 205 mg/L.
In a river, oxygen is consumed by decay and restored by reaeration. The dissolved oxygen sag curve reaches its minimum (the critical point) where the rate of deoxygenation equals the rate of reaeration.
3. Mass balances and reactors
For a steady state, input = output + reaction. Mixing two streams:
A completely mixed reactor (CSTR) with first-order decay k and detention time θ = V/Q has an effluent concentration:
Mixing and reactors
Mixing: a river of 10 m³/s at 2 mg/L receives 1 m³/s at 30 mg/L: C = (20 + 30)/11 = 4.5 mg/L.
CSTR: C₀ = 100 mg/L, k = 0.5 h⁻¹, θ = 2 h: C = 100/(1 + 1) = 50 mg/L.
4. Drinking water treatment
The conventional surface-water train is:
- Coagulation and flocculation: add alum or iron salts; gentle mixing builds settleable floc.
- Sedimentation: gravity settling in a basin.
- Filtration: sand or dual-media filters remove remaining particles.
- Disinfection: chlorine, chloramine, ozone or UV; effectiveness is judged by the product C·t (concentration × contact time).
Softening removes hardness with lime and soda ash. Design a settling basin with the overflow rate v₀ = Q/A and the detention time t = V/Q.
Clarifier design
Given: Q = 0.1 m³/s, surface area 50 m², volume 600 m³.
Solution: v₀ = 0.1/50 = 0.002 m/s (173 m/day). t = 600/0.1 = 6,000 s = 1.67 h.
A particle settles if its Stokes settling velocity (proportional to diameter squared) exceeds the overflow rate.
5. Wastewater treatment
- Preliminary: screens and grit removal.
- Primary: sedimentation removes settleable solids and some BOD.
- Secondary: biological treatment (activated sludge, trickling filter) removes dissolved organics.
- Tertiary: nutrient removal, filtration, disinfection.
Activated-sludge design uses two numbers:
Activated sludge
F/M: Q = 1000 m³/d, S₀ = 200 mg/L, V = 500 m³, X = 2000 mg/L gives F/M = (1000 × 200)/(500 × 2000) = 0.2 d⁻¹.
SRT: V = 1000 m³, X = 3000 mg/L, wasting 20 m³/d at 10,000 mg/L gives SRT = (1000 × 3000)/(20 × 10,000) = 15 d.
Loading in lb/day uses the conversion 8.34 × Q(MGD) × C(mg/L); 2 MGD at 20 mg/L is 334 lb/day.
6. Air pollution
Convert gas concentrations with the molar volume 24.45 L/mol (25 °C, 1 atm): mg/m³ = ppm × MW/24.45. For SO₂ (MW 64), 100 ppm is about 262 mg/m³. Control devices: cyclones and baghouses for particles, scrubbers and adsorbers for gases, and catalytic converters for exhaust.
7. Solid and hazardous waste
Modern landfills have liners, leachate collection and gas management. Hazardous waste is managed under RCRA from generation to disposal ("cradle to grave"). Waste reduction hierarchy: reduce, reuse, recycle, recover energy, then dispose.
Common mistakes
- Using base-10 and base-e rate constants interchangeably.
- Forgetting the 8.34 factor (or using it with the wrong flow unit).
- Treating hardness in mg/L of ion rather than as CaCO₃.
- Putting treatment steps in the wrong order.
- Confusing detention time with overflow rate.
Exam strategy
Memorize the treatment sequence for water and wastewater and the handful of formulas above. Write units on every term, and sketch a block diagram with arrows for flows when doing a mass balance.
Checklist
- [ ] I can compute BOD exerted and apply a mass balance.
- [ ] I can list the steps of water and wastewater treatment in order.
- [ ] I can size a clarifier with overflow rate and detention time.
- [ ] I can compute F/M, SRT and mass loading.
- [ ] I can convert ppm to mg/m³ for a gas.
Formula summary
- BOD exerted
- BOD_t = L₀ (1 − e^(−kt))
- Mixing
- C = (Q₁C₁ + Q₂C₂)/(Q₁ + Q₂)
- Detention time
- t = V / Q
- Overflow rate
- v₀ = Q / A
- Hardness
- mg/L as CaCO₃ = mg/L ion × 50/EW
Worked problems
1. A wastewater has an ultimate BOD L₀ = 300 mg/L and k = 0.23 day⁻¹ (base e). The 5-day BOD is closest to:
- 95 mg/L
- 205 mg/L
- 250 mg/L
- 300 mg/L
Answer: B. BOD₅ = 300(1 − e^(−0.23×5)) = 300(1 − 0.3166) = 205 mg/L.
2. A river (10 m³/s, 2 mg/L) receives an effluent (1 m³/s, 30 mg/L). Fully mixed, the concentration is closest to:
- 2.0 mg/L
- 4.5 mg/L
- 16 mg/L
- 32 mg/L
Answer: B. C = (10×2 + 1×30)/11 = 50/11 = 4.55 mg/L.
3. A clarifier has 50 m² of surface area and treats 0.1 m³/s. The surface overflow rate is:
- 0.002 m/s
- 0.02 m/s
- 0.5 m/s
- 5 m/s
Answer: A. Q/A = 0.1/50 = 0.002 m/s (≈ 173 m/day).
4. Water contains 80 mg/L of Ca²⁺ (equivalent weight 20). Its calcium hardness as CaCO₃ is:
- 80 mg/L
- 100 mg/L
- 160 mg/L
- 200 mg/L
Answer: D. 80 × (50/20) = 200 mg/L as CaCO₃.
5. A 600 m³ basin receives 0.1 m³/s. The detention time is closest to:
- 0.6 h
- 1.7 h
- 3.3 h
- 6.0 h
Answer: B. t = V/Q = 600/0.1 = 6,000 s = 1.67 h.
6. Which sequence correctly orders conventional surface-water treatment?
- Filtration → coagulation → sedimentation → disinfection
- Coagulation → flocculation → sedimentation → filtration → disinfection
- Disinfection → filtration → sedimentation → coagulation
- Sedimentation → coagulation → disinfection → filtration
Answer: B. Coagulate and flocculate to form settleable floc, settle it, filter remaining particles, then disinfect.
7. The main purpose of activated sludge in wastewater treatment is to:
- Remove grit
- Biologically remove dissolved organic matter
- Raise pH
- Remove heavy metals by filtration
Answer: B. Activated sludge uses aerated microbial flocs to consume dissolved and colloidal organics.
8. A plant discharges 2 MGD with a concentration of 20 mg/L. The loading in lb/day (8.34 conversion) is closest to:
- 40
- 167
- 334
- 3,336
Answer: C. Load = 8.34 × Q(MGD) × C(mg/L) = 8.34 × 2 × 20 = 334 lb/day.
9. A chlorine dose of 2.0 mg/L is applied to water with a chlorine demand of 0.5 mg/L. The residual is:
- 0.5 mg/L
- 1.5 mg/L
- 2.0 mg/L
- 2.5 mg/L
Answer: B. Residual = dose − demand = 2.0 − 0.5 = 1.5 mg/L.
10. A solution has [OH⁻] = 1×10⁻³ M at 25 °C. Its pH is:
- 3
- 10
- 11
- 14
Answer: C. pOH = 3, so pH = 14 − 3 = 11.
11. An activated sludge basin has V = 1,000 m³ and X = 3,000 mg/L. Waste sludge flow is 20 m³/d at 10,000 mg/L. The solids retention time is:
- 6.7 days
- 15 days
- 30 days
- 150 days
Answer: B. SRT = VX/(Q_wX_w) = (1000 × 3000)/(20 × 10,000) = 15 days.
12. By Stokes’ law, if the diameter of a settling sphere doubles (same density), the settling velocity becomes:
- 2×
- 4×
- 8×
- Unchanged
Answer: B. v ∝ d², so doubling d gives 4× the settling velocity.
13. At 25 °C and 1 atm, 100 ppm of SO₂ (MW 64) corresponds to a concentration closest to (24.45 L/mol):
- 64 mg/m³
- 100 mg/m³
- 262 mg/m³
- 2,445 mg/m³
Answer: C. mg/m³ = ppm × MW/24.45 = 100 × 64/24.45 = 262 mg/m³.
14. A city of 50,000 people uses 100 gallons per capita per day. Average demand is:
- 0.5 MGD
- 5 MGD
- 50 MGD
- 500 MGD
Answer: B. 50,000 × 100 = 5,000,000 gal/day = 5 MGD.
15. At the critical point of the dissolved oxygen sag curve:
- DO is at saturation
- BOD is zero
- The rate of deoxygenation equals the rate of reaeration, and DO is at its minimum
- Reaeration is zero
Answer: C. The DO minimum occurs where oxygen consumption by decay equals oxygen supplied by reaeration.
Chapter 4 · approx. 10–15% (with Design)
Structural Analysis
Overview
Structural analysis finds the reactions, internal forces and deflections of beams, trusses and frames. On the FE you will mostly solve determinate structures by statics, read a shear or moment diagram, use a standard deflection formula, and recognise when a structure is indeterminate.
1. Determinacy and stability
- Beams and frames (2D): compare the number of unknown reactions r with the three equilibrium equations. r = 3 is determinate, r > 3 is indeterminate to the degree r − 3, and fewer reactions can mean the structure is unstable.
- Trusses: with m members, r reactions and j joints, m + r = 2j is determinate and m + r > 2j is indeterminate by that excess.
A propped cantilever has four reactions, so it is indeterminate to the first degree; a fixed–fixed beam has six reactions in 2D, so with no axial load it is indeterminate to the second degree.
2. Shear and bending-moment diagrams
Relationships between load w, shear V and moment M:
The shear changes by the area under the load diagram; the moment changes by the area under the shear diagram. The maximum moment occurs where the shear is zero (or crosses zero).
Shear and moment for a uniform load
Given: a simply supported 8 m beam carries w = 3 kN/m.
Solution: each reaction is 12 kN, so V(x) = 12 − 3x. The shear is zero at x = 4 m. M_max = 12(4) − 3(4²)/2 = 24 kN·m, matching wL²/8 = 3(64)/8.
Sign convention: a positive moment causes tension in the bottom fibre (sagging).
3. Trusses
Use the method of joints or sections (see the Statics guide). Tension is positive. The zero-force rules reduce the work.
Joint equilibrium
Given: a 20 kN load hangs at a joint where two members each make 30° with the horizontal.
Solution: vertical equilibrium: 2F sin 30° = 20, so F = 20 kN in each member.
4. Deflections
Beams with constant EI have standard results.
| Case | Deflection |
|---|---|
| Simple beam, uniform load w | 5wL⁴/(384EI) at midspan |
| Simple beam, central load P | PL³/(48EI) |
| Cantilever, end load P | PL³/(3EI) |
| Cantilever, uniform load w | wL⁴/(8EI) |
Use superposition for combined loads: add the effects of each load acting alone. Convert units before substituting (feet to inches when E is in ksi).
Cantilever deflection
Given: L = 10 ft, E = 29,000 ksi, I = 500 in⁴, P = 5 kip at the tip.
Solution: δ = PL³/3EI = 5(120)³/[3(29,000)(500)] = 0.199 in.
The moment-area and conjugate-beam methods give slopes and deflections for non-standard loadings.
5. Influence lines
An influence line shows the value of a reaction, shear or moment at one fixed point as a unit load moves across the structure. The ordinate under the load times the load gives the response. For a simple beam, the reaction influence line at A varies linearly from 1.0 when the load is at A to 0 when the load is at B.
6. Indeterminate structures
Use compatibility (deformations) as well as equilibrium. Handy standard results:
Propped cantilever
Given: w = 2 kN/m over L = 6 m, fixed at one end and roller-supported at the other.
Solution: the roller reaction is 3wL/8 = 3(2)(6)/8 = 4.5 kN.
Moment distribution handles continuous beams and frames. Member stiffness is 4EI/L when the far end is fixed and 3EI/L when it is pinned. The distribution factor at a joint is a member's stiffness divided by the joint's total stiffness.
Distribution factors
Given: at a joint, member 1 (I = 2000, L = 10, far end fixed) and member 2 (I = 1000, L = 10, far end pinned), same E.
Solution: k₁ = 4(2000)/10 = 800 and k₂ = 3(1000)/10 = 300. DF₁ = 800/1100 = 0.727 and DF₂ = 0.273.
7. Section properties
Bending stress σ = M/S depends on the section modulus S = I/c. For a rectangle I = bh³/12. A 6 in × 12 in rectangle has I = 6(1728)/12 = 864 in⁴.
Common mistakes
- Using feet and inches together in deflection formulas.
- Forgetting that the maximum moment is where V = 0, not necessarily at midspan.
- Counting a roller as providing two reactions.
- Mixing up stiffness 4EI/L (fixed far end) and 3EI/L (pinned far end).
- Overlooking zero-force members.
Exam strategy
Draw the free-body diagram, solve the reactions, then sketch V and M. Prefer standard formulas to integration. For indeterminate beams, memorise the fixed-end moments.
Checklist
- [ ] I can classify beams and trusses as determinate or indeterminate.
- [ ] I can draw shear and moment diagrams and locate the maximum moment.
- [ ] I can use the standard deflection formulas and superposition.
- [ ] I can read an influence line.
- [ ] I can find stiffness and distribution factors for moment distribution.
Formula summary
- Truss determinacy
- m + r = 2j
- SS beam point load
- M = PL/4, Δ = PL³/(48EI)
- Cantilever end load
- M = PL, Δ = PL³/(3EI)
- Fixed-end moment
- FEM = wL²/12
- Stiffness
- k = 4EI/L (fixed far end), 3EI/L (pinned)
Worked problems
1. A 10 ft cantilever (E = 29,000 ksi, I = 500 in⁴) carries a 5 kip load at its tip. The tip deflection is closest to:
- 0.05 in
- 0.20 in
- 0.60 in
- 2.4 in
Answer: B. δ = PL³/3EI = 5(120)³/(3 × 29,000 × 500) = 8.64×10⁶/4.35×10⁷ = 0.199 in.
2. A 12 ft fixed–fixed beam carries a uniform 2 kip/ft. The end moment magnitude is:
- 12 kip·ft
- 24 kip·ft
- 36 kip·ft
- 48 kip·ft
Answer: B. wL²/12 = 2(144)/12 = 24 kip·ft.
3. A truss has 8 members, 5 joints and 3 reaction components. It is:
- Unstable
- Statically determinate
- Indeterminate to the first degree
- Indeterminate to the third degree
Answer: C. m + r = 11 and 2j = 10, so it is indeterminate to the first degree.
4. The shear at midspan of a simply supported beam with a symmetric uniform load is:
- wL/2
- wL/4
- wL²/8
- Zero
Answer: D. By symmetry the shear diagram crosses zero at midspan, where the moment is maximum.
5. A simply supported 8 m beam carries a 30 kN load at midspan. The maximum moment is:
- 30 kN·m
- 60 kN·m
- 120 kN·m
- 240 kN·m
Answer: B. M = PL/4 = 30(8)/4 = 60 kN·m.
6. In moment distribution, the stiffness of a prismatic beam member whose far end is pinned is:
- EI/L
- 3EI/L
- 4EI/L
- 12EI/L³
Answer: B. Pinned far end: 3EI/L. Fixed far end: 4EI/L.
7. At an unloaded truss joint where exactly two non-collinear members meet, the member forces are:
- Both tension
- Both compression
- Both zero
- Equal and opposite
Answer: C. With no external load, equilibrium of the joint forces both members to carry zero force.
8. A simply supported 8 m beam carries a uniform 3 kN/m. Each reaction is:
- 6 kN
- 12 kN
- 24 kN
- 3 kN
Answer: B. Total load = 24 kN; each reaction = 12 kN.
9. A 10 ft simply supported beam has a 10 kip load 3 ft from A and a 5 kip load 7 ft from A. The reaction at A is:
- 6.5 kip
- 7.5 kip
- 8.5 kip
- 9.0 kip
Answer: C. ΣM_B: R_A(10) = 10(7) + 5(3) = 85 → R_A = 8.5 kip.
10. A joint carries a 20 kN downward load supported by two identical members, each at 30° to the horizontal. The force in each is:
- 10 kN
- 20 kN
- 34.6 kN
- 40 kN
Answer: B. 2F sin30° = 20 → F = 20 kN.
11. The moment of inertia about the centroidal axis of a 6 in wide × 12 in deep rectangle is:
- 216 in⁴
- 432 in⁴
- 864 in⁴
- 6,912 in⁴
Answer: C. I = bh³/12 = 6(1728)/12 = 864 in⁴.
12. A simply supported 20 ft beam (E = 29,000 ksi, I = 1,000 in⁴) carries 1.5 kip/ft. The midspan deflection is closest to:
- 0.09 in
- 0.19 in
- 0.37 in
- 1.9 in
Answer: B. w = 0.125 kip/in, L = 240 in. Δ = 5wL⁴/384EI = 5(0.125)(240)⁴/(384 × 29,000 × 1,000) = 0.186 in.
13. The influence line ordinate for the reaction at support A, with a unit load directly over A, is:
- 0
- 0.5
- 1.0
- L
Answer: C. With the load at A the entire unit load goes to A: ordinate = 1.0.
14. A propped cantilever (fixed at one end, roller at the other) is statically indeterminate to the:
- Zeroth degree
- First degree
- Second degree
- Third degree
Answer: B. Four reaction components versus three equilibrium equations → first degree.
15. A beam section has S = 400×10³ mm³ and carries M = 60 kN·m. The bending stress is:
- 15 MPa
- 24 MPa
- 150 MPa
- 240 MPa
Answer: C. σ = M/S = 60×10⁶/400×10³ = 150 MPa.
Chapter 5 · approx. 10–15% (with Analysis)
Structural Design (Steel & Concrete)
Overview
Structural design applies analysis results to size members in steel and reinforced concrete. The FE tests the philosophy (LRFD versus ASD), a few member-strength equations, and simple reinforced-concrete flexure and shear. Equations come from AISC and ACI; the Reference Handbook provides them, so your job is to know which one applies.
1. Design philosophies and loads
- LRFD (load and resistance factor design): factored loads must not exceed design strength, φR_n ≥ R_u.
- ASD (allowable strength design): unfactored loads must not exceed allowable strength, R_n/Ω ≥ R_a.
Common gravity combinations:
| Method | Combination |
|---|---|
| LRFD | 1.4D; 1.2D + 1.6L (+ 0.5 L_r, S or R) |
| LRFD with roof live | 1.2D + 1.6(L_r or S or R) + (L or 0.5W) |
| LRFD wind | 1.2D + 1.0W + L + 0.5(L_r or S or R); 0.9D + 1.0W |
| ASD | D + L; D + (L_r or S or R); D + 0.75L + 0.75(L_r or S or R) |
Load combinations
Given: D = 40 kips, L = 60 kips.
Solution: ASD: D + L = 100 kips. LRFD: 1.2(40) + 1.6(60) = 144 kips.
2. Structural steel
Typical properties: A36 has F_y = 36 ksi; A992 wide-flange shapes have F_y = 50 ksi and F_u = 65 ksi; E = 29,000 ksi.
Tension members
Design strength is the smaller of yielding of the gross area and rupture of the net area.
The net area subtracts the bolt holes (hole diameter = bolt diameter + 1/8 in): A_n = A_g − Σ(d_hole × t).
Compression members
Compute the slenderness KL/r and the elastic buckling stress:
If KL/r ≤ 4.71√(E/F_y) (about 113 for F_y = 50 ksi) the column buckles inelastically: F_cr = [0.658^(F_y/F_e)] F_y. Otherwise F_cr = 0.877 F_e. Then φP_n = 0.90 F_cr A_g.
Column strength
Given: a W-shape with A_g = 10 in², F_y = 50 ksi and KL/r = 72.
Solution: F_e = 9.87(29,000)/72² = 55.2 ksi. F_y/F_e = 0.906, so F_cr = 0.658^0.906 (50) = 34.2 ksi. φP_n = 0.90(34.2)(10) = 308 kips.
Beams
For a compact, laterally braced beam the plastic moment governs.
Steel beam flexure
Given: Z_x = 100 in³, F_y = 50 ksi.
Solution: M_p = 50(100) = 5,000 kip·in = 416.7 kip·ft, so φM_n = 375 kip·ft.
Lateral–torsional buckling reduces strength when the compression flange is not braced. Also check shear and deflection.
3. Reinforced concrete
Concrete is strong in compression and weak in tension; steel bars carry the tension. Properties: E_c = 57,000√f′_c (psi); a 4,000 psi concrete has E_c ≈ 3,600 ksi.
Flexure (rectangular section)
The reinforcement ratio is ρ = A_s/(bd). Minimum steel is the larger of 3√f′_c bd/f_y and 200bd/f_y.
Concrete beam flexure
Given: b = 12 in, d = 20 in, A_s = 3.0 in², f_y = 60 ksi, f′_c = 4 ksi.
Solution: a = 3.0(60)/[0.85(4)(12)] = 4.41 in. M_n = 3.0(60)(20 − 2.21) = 3,203 kip·in = 267 kip·ft; φM_n = 240 kip·ft.
Check: c = a/0.85 = 5.19 in and ε_t = 0.003(20 − 5.19)/5.19 = 0.0086 > 0.005, so the section is tension-controlled.
Shear
Stirrup spacing
Given: V_u = 45 kips, b_w = 12 in, d = 20 in, f′_c = 4,000 psi, two-leg #3 stirrups (A_v = 0.22 in²), f_yt = 60 ksi.
Solution: V_c = 2√4000(12)(20) = 30.4 kips. Required V_s = 45/0.75 − 30.4 = 29.6 kips. s = 0.22(60)(20)/29.6 = 8.9 in, so use 8 in.
Detailing basics
Bar sizes: bar number = diameter in eighths of an inch (#8 = 1 in). Provide cover to protect against corrosion, enough development length for bars to reach their strength, and limit spacing for crack control.
4. Other materials
Timber design uses allowable stresses adjusted for duration, moisture and size. Masonry is strong in compression and reinforced for flexure. Connections: bolts fail in shear, bearing or tension; welds are sized by throat area.
Common mistakes
- Using gross area where net area controls (tension with bolt holes).
- Forgetting the strength reduction factor φ.
- Mixing psi and ksi in the concrete shear equation.
- Applying the elastic column formula when the column is stocky.
- Using LRFD factors with ASD allowable strengths.
Exam strategy
Identify LRFD or ASD first, compute the demand, then compute the capacity and compare. Keep a unit table beside the equations. For columns, compute KL/r and compare it to the 113 threshold before choosing an equation.
Checklist
- [ ] I can build LRFD and ASD load combinations.
- [ ] I can compute tension, compression and flexural strength for steel.
- [ ] I can find the nominal and design moment of a concrete beam.
- [ ] I can find stirrup spacing from concrete and steel shear.
- [ ] I know the standard material properties (A992, A36, concrete modulus).
Formula summary
- LRFD vs ASD
- U = 1.2D + 1.6L | ASD: D + L
- Tension yielding
- φP_n = 0.9 F_y A_g
- Plastic moment
- M_p = F_y Z_x, φM_n = 0.9 M_p
- Concrete modulus
- E_c = 57,000 √f′_c (psi)
- Concrete shear
- V_c = 2 √f′_c b_w d (psi, in)
- Reinforcement ratio
- ρ = A_s / (b d)
Worked problems
1. A steel tension member has A_g = 5.0 in² and F_y = 50 ksi. The yielding design strength φP_n is:
- 125 kips
- 225 kips
- 250 kips
- 275 kips
Answer: B. φP_n = 0.9(50)(5.0) = 225 kips.
2. A column has K = 1.0, L = 12 ft and r = 2.0 in. The slenderness ratio KL/r is:
- 6
- 36
- 72
- 144
Answer: C. KL/r = 1.0(144 in)/2.0 in = 72.
3. A concrete beam has f′_c = 4,000 psi, b_w = 12 in and d = 20 in. Using V_c = 2√f′_c b_w d, V_c is closest to:
- 15 kips
- 30 kips
- 45 kips
- 60 kips
Answer: B. 2(63.25)(12)(20) = 30,360 lb = 30.4 kips.
4. For f′_c = 4,000 psi normal-weight concrete, E_c = 57,000√f′_c is closest to:
- 1,800 ksi
- 3,600 ksi
- 4,000 ksi
- 5,700 ksi
Answer: B. 57,000(63.25) = 3.605×10⁶ psi = 3,605 ksi.
5. A W-shape has Z_x = 100 in³ and F_y = 50 ksi. The design flexural strength φM_n (compact, braced) is closest to:
- 208 kip·ft
- 375 kip·ft
- 417 kip·ft
- 4,500 kip·ft
Answer: B. M_p = 50(100) = 5,000 kip·in = 416.7 kip·ft; φM_n = 0.9(416.7) = 375 kip·ft.
6. A beam has A_s = 2.4 in², b = 12 in and d = 20 in. The reinforcement ratio ρ is:
- 0.005
- 0.010
- 0.020
- 0.100
Answer: B. ρ = 2.4/(12 × 20) = 0.010.
7. Dead load is 40 kips and live load is 60 kips. The required strength is (ASD, LRFD):
- 100 kips; 144 kips
- 100 kips; 120 kips
- 144 kips; 100 kips
- 100 kips; 100 kips
Answer: A. ASD: D + L = 100. LRFD: 1.2(40) + 1.6(60) = 48 + 96 = 144 kips.
8. The elastic buckling stress F_e = π²E/(KL/r)² for KL/r = 100 and E = 29,000 ksi is:
- 2.9 ksi
- 28.6 ksi
- 57.2 ksi
- 286 ksi
Answer: B. F_e = 9.87(29,000)/10,000 = 28.6 ksi.
9. A beam has b = 10 in, d = 18 in, A_s = 2.0 in², f_y = 60 ksi and f′_c = 3 ksi. The nominal moment M_n is closest to:
- 100 kip·ft
- 141 kip·ft
- 156 kip·ft
- 180 kip·ft
Answer: C. a = 2(60)/(0.85 × 3 × 10) = 4.71 in. M_n = 120(18 − 2.35) = 1,878 kip·in = 156 kip·ft. (φM_n = 141.)
10. For f′_c = 4,000 psi, f_y = 60,000 psi, b = 12 in and d = 20 in, the ACI minimum flexural steel is the larger of 3√f′_c bd/f_y and 200bd/f_y. The result is:
- 0.40 in²
- 0.76 in²
- 0.80 in²
- 1.20 in²
Answer: C. 3√4000(240)/60,000 = 0.76; 200(240)/60,000 = 0.80. The larger governs: 0.80 in².
11. A 20 ft simply supported steel beam has w_D = 1.0 kip/ft and w_L = 2.0 kip/ft. The LRFD factored moment (1.2D + 1.6L) is:
- 150 kip·ft
- 176 kip·ft
- 220 kip·ft
- 264 kip·ft
Answer: C. w_u = 1.2(1.0) + 1.6(2.0) = 4.4 kip/ft. M_u = 4.4(400)/8 = 220 kip·ft. (ASD: 3.0(50) = 150.)
12. Two-leg #3 stirrups (A_v = 0.22 in²), f_yt = 60 ksi and d = 20 in must supply V_s = 44 kips. The required spacing is:
- 3 in
- 6 in
- 8 in
- 12 in
Answer: B. s = A_v f_yt d/V_s = 0.22(60)(20)/44 = 6.0 in.
13. A plate has A_g = 6.0 in², thickness 0.5 in, with two 7/8-in bolts across the section (use hole diameter = 1.0 in). The net area is:
- 4.0 in²
- 5.0 in²
- 5.5 in²
- 6.0 in²
Answer: B. A_n = 6.0 − 2(1.0)(0.5) = 5.0 in².
14. The specified yield stress of ASTM A992 wide-flange steel is:
- 36 ksi
- 50 ksi
- 60 ksi
- 65 ksi
Answer: B. A992 has F_y = 50 ksi and F_u = 65 ksi.
15. D = 50 kips, L = 40 kips, S = 20 kips. The LRFD combination 1.2D + 1.6L + 0.5S gives:
- 114 kips
- 124 kips
- 134 kips
- 150 kips
Answer: C. 60 + 64 + 10 = 134 kips.
Chapter 6 · approx. 10–15%
Geotechnical Engineering
Overview
Geotechnical engineering analyses soil and rock as foundations and construction material. Questions cover soil classification, phase relationships, compaction, seepage, effective stress, settlement, shear strength, earth pressure and simple stability checks. Soil mechanics works in effective stress: σ′ = σ − u.
1. Soil classification and index properties
- Grain size (sieve analysis) gives D₁₀, D₃₀ and D₆₀. Uniformity coefficient C_u = D₆₀/D₁₀ and curvature C_c = D₃₀²/(D₁₀D₆₀). A well-graded sand has C_u > 6 and 1 < C_c < 3.
- Atterberg limits (fine-grained soils): liquid limit LL, plastic limit PL, plasticity index PI = LL − PL, and liquidity index (w − PL)/PI.
- USCS: a soil with more than 50% passing the No. 200 sieve is fine-grained. Use the plasticity chart: above the A-line (PI = 0.73(LL − 20)) is clay (C), below is silt (M); LL < 50 is low plasticity (L), LL ≥ 50 is high (H).
2. Phase relationships
Phase relations
Given: a saturated soil with w = 20% and G_s = 2.7.
Solution: e = wG_s = 0.54. γ_sat = (2.7 + 0.54)(9.81)/1.54 = 20.6 kN/m³.
3. Compaction
The Proctor test relates dry unit weight to water content; the peak is the maximum dry unit weight at the optimum moisture content. Field relative compaction is γ_d,field/γ_d,max, usually specified as 90–98%.
Relative compaction
Given: field γ_d = 17.1 kN/m³ and Proctor maximum 18.0 kN/m³.
Solution: 17.1/18.0 = 95%.
4. Seepage
Darcy's law: Q = k i A with i = Δh/L. A flow net gives seepage per unit width, q = k h (N_f/N_d), where N_f is the number of flow channels and N_d the number of equipotential drops. Seepage upward reduces effective stress; when it reaches zero the soil is in a quick condition.
5. Effective stress and stress increase
At depth z below ground, total stress σ = Σγh and pore pressure u = γ_w h_w below the water table.
Effective stress profile
Given: 3 m of sand (γ = 17 kN/m³) above the water table and 4 m of saturated sand (γ_sat = 20 kN/m³) below.
Solution: at 7 m, σ = 3(17) + 4(20) = 131 kPa, u = 9.81(4) = 39.2 kPa, σ′ = 91.8 kPa.
Stress beneath a footing is estimated by the 2:1 method: Δσ = Q/[(B + z)(L + z)].
2:1 method
Given: Q = 1,000 kN on a 2 m × 2 m footing, at depth z = 3 m.
Solution: Δσ = 1000/(5 × 5) = 40 kPa.
6. Consolidation
Saturated clay squeezes out water under load. Primary settlement of a normally consolidated layer:
Use the mid-depth effective stress. The time rate follows the time factor T_v = c_v t/H_dr², where H_dr is the longest drainage path (half the thickness for two-way drainage). T_v = 0.197 for 50% consolidation and 0.848 for 90%. Doubling the drainage path quadruples the time.
Settlement and time
Settlement: C_c = 0.25, H = 2 m, e₀ = 0.8, σ′₀ = Δσ = 50 kPa gives S = 0.25(2)/1.8 × log 2 = 0.084 m = 84 mm.
Time: H_dr = 2 m and c_v = 0.004 m²/day give t₅₀ = 0.197(2²)/0.004 = 197 days.
7. Shear strength
Mohr–Coulomb: τ_f = c′ + σ′ tan φ′. Clean sand has c′ = 0. Triaxial and direct shear tests determine c′ and φ′. For clay in a quick (undrained) loading, τ_f = c_u.
Shear strength of sand
Given: c′ = 0, φ′ = 32°, σ′ = 150 kPa.
Solution: τ_f = 150 tan 32° = 93.7 kPa.
8. Lateral earth pressure and retaining walls
Thrust on a wall of height H: P = ½ K γ H², acting at H/3 above the base. For φ = 30°, K_a = 1/3 and K_p = 3. Check overturning (FS = resisting moment/overturning moment, at least 2) and sliding (FS = resisting force/driving force, at least 1.5).
Wall stability
Given: a 5 m wall retains soil with γ = 18 kN/m³ and φ = 30°.
Solution: P_a = ½(1/3)(18)(25) = 75 kN/m at 1.67 m, so M_o = 125 kN·m/m. With a resisting moment of 500 kN·m/m, FS_overturning = 4.0.
Sliding: if W = 150 kN/m and base friction is tan 20° = 0.364, resisting force = 54.6 kN/m and FS = 54.6/75 = 0.73, which fails; widen the base or add a key.
9. Bearing capacity and slopes
Allowable bearing pressure q_all = q_ult/FS with FS around 3, and footing load Q = q_all × A. For an infinite slope in dry sand, FS = tan φ/tan β, so a slope is stable only when the slope angle β is below φ.
Common mistakes
- Using total stress where effective stress is required.
- Forgetting that U = 50% corresponds to T_v = 0.197 and uses H_dr, not full thickness.
- Mixing up K_a and K_p, or putting the thrust at H/2 instead of H/3.
- Using the unit weight of dry soil below the water table.
- Using the surface elevation instead of mid-layer for consolidation stresses.
Exam strategy
Draw the soil profile with the water table. Build a small table of layers with γ, thickness, σ, u and σ′. Check each stability factor of safety against its minimum.
Checklist
- [ ] I can classify soils by grain size and plasticity.
- [ ] I can solve phase and compaction problems.
- [ ] I can compute effective stress and stress increase under a footing.
- [ ] I can compute consolidation settlement and time.
- [ ] I can find earth pressure and wall factors of safety.
Formula summary
- Saturation relation
- S e = w G_s
- Dry unit weight
- γ_d = γ / (1 + w)
- Effective stress
- σ′ = σ − u
- Mohr–Coulomb
- τ = c′ + σ′ tan φ′
- Earth pressure
- K_a = tan²(45° − φ/2), K_p = 1/K_a
- Consolidation time
- t ∝ H_dr²
Worked problems
1. A saturated soil has w = 20% and G_s = 2.7. Its void ratio is:
- 0.27
- 0.54
- 0.74
- 1.35
Answer: B. S = 1, so e = wG_s = 0.20 × 2.7 = 0.54.
2. A saturated soil has G_s = 2.65 and e = 0.6. The total unit weight is closest to:
- 16.3 kN/m³
- 18.0 kN/m³
- 19.9 kN/m³
- 22.4 kN/m³
Answer: C. γ = (2.65 + 0.6)(9.81)/1.6 = 19.9 kN/m³.
3. A soil has c′ = 10 kPa and φ′ = 30°. The shear strength at σ′ = 100 kPa is closest to:
- 50 kPa
- 58 kPa
- 68 kPa
- 110 kPa
Answer: C. τ = 10 + 100 tan30° = 10 + 57.7 = 67.7 kPa.
4. Sand (γ = 17 kN/m³) extends 3 m above the water table, with saturated sand (γ_sat = 20 kN/m³) for 4 m below. The effective vertical stress at the bottom of the 7 m profile is closest to:
- 92 kPa
- 131 kPa
- 140 kPa
- 170 kPa
Answer: A. σ = 17(3) + 20(4) = 131 kPa; u = 9.81(4) = 39.2 kPa; σ′ = 91.8 kPa.
5. A soil sample has k = 1×10⁻⁴ m/s, area 0.2 m², and a head difference of 1.5 m over a 3 m length. The flow is:
- 1×10⁻⁶ m³/s
- 1×10⁻⁵ m³/s
- 3×10⁻⁵ m³/s
- 1×10⁻⁴ m³/s
Answer: B. i = 1.5/3 = 0.5; Q = (10⁻⁴)(0.5)(0.2) = 1×10⁻⁵ m³/s.
6. For φ = 30°, the Rankine passive earth pressure coefficient is:
- 0.33
- 1.0
- 3.0
- 9.0
Answer: C. K_p = tan²(60°) = 3 = 1/K_a.
7. A compacted soil has γ = 20 kN/m³ and w = 12%. Its dry unit weight is closest to:
- 16.0 kN/m³
- 17.9 kN/m³
- 19.0 kN/m³
- 22.4 kN/m³
Answer: B. γ_d = 20/1.12 = 17.9 kN/m³.
8. If the longest drainage path in a consolidating clay layer doubles, the time to reach the same degree of consolidation:
- Doubles
- Quadruples
- Is unchanged
- Halves
Answer: B. t ∝ H_dr², so doubling H_dr gives 4× the time.
9. A soil has LL = 45 and PL = 25. The plasticity index is:
- 10
- 20
- 45
- 70
Answer: B. PI = LL − PL = 20.
10. Field dry unit weight is 17.1 kN/m³ and the Proctor maximum is 18.0 kN/m³. The relative compaction is:
- 90%
- 95%
- 98%
- 105%
Answer: B. 17.1/18.0 = 0.95 = 95%.
11. A 2 m × 3 m footing carries 1,200 kN. The average contact pressure is:
- 100 kPa
- 200 kPa
- 400 kPa
- 600 kPa
Answer: B. q = Q/A = 1,200/6 = 200 kPa.
12. A 2 m clay layer has C_c = 0.25, e₀ = 0.8, σ′₀ = 50 kPa and Δσ = 50 kPa. The consolidation settlement is closest to:
- 42 mm
- 84 mm
- 167 mm
- 300 mm
Answer: B. S = 0.25(2)/1.8 × log(100/50) = 0.2778 × 0.301 = 0.0836 m = 84 mm.
13. A retaining wall has a resisting moment of 900 kN·m/m and an overturning moment of 300 kN·m/m. The overturning factor of safety is:
- 0.33
- 1.5
- 2.0
- 3.0
Answer: D. FS = M_r/M_o = 900/300 = 3.0.
14. A sieve analysis gives D₁₀ = 0.1 mm and D₆₀ = 0.6 mm. The coefficient of uniformity C_u is:
- 0.17
- 0.6
- 6
- 60
Answer: C. C_u = D₆₀/D₁₀ = 6.
15. A soil has 60% passing the No. 200 sieve, LL = 50 and PI = 30 (above the A-line). The USCS classification is:
- CL
- CH
- ML
- SP
Answer: B. Fine-grained with LL > 50 and PI above the A-line (0.73(LL − 20) = 21.9) → CH, a fat clay.
16. A dry, cohesionless infinite slope (φ = 35°) is inclined at β = 20°. The factor of safety is closest to:
- 0.52
- 1.75
- 1.92
- 2.50
Answer: C. FS = tanφ/tanβ = 0.700/0.364 = 1.92.
Chapter 7 · approx. 9–14%
Transportation Engineering
Overview
Transportation engineering covers geometric design of roads, traffic flow and capacity, signal timing, pavement design and travel demand. FE questions apply short formulas to speeds, volumes and curves. Be careful with units: speeds in mph, distances in feet.
1. Sight distance
Stopping sight distance is the distance travelled during perception–reaction and braking.
V is the speed in mph, t is the reaction time (2.5 s), f the friction coefficient and G the grade as a decimal (negative on a downgrade).
Stopping sight distance
Given: V = 60 mph, t = 2.5 s, f = 0.35, level road.
Solution: 1.47(60)(2.5) = 220.5 ft and 3600/(30 × 0.35) = 342.9 ft, so SSD = 563 ft.
On a 4% downgrade at 50 mph: 183.8 + 2500/[30(0.35 − 0.04)] = 183.8 + 268.8 = 452.6 ft.
2. Horizontal curves
The side-friction and superelevation relationship:
V is in mph and R in feet. Limit e (about 6–8%) and f (depends on speed) and choose the minimum radius that satisfies both.
Minimum radius
Given: V = 60 mph, e = 0.08, f = 0.12.
Solution: R = 60²/[15(0.20)] = 1,200 ft.
Curve geometry (T, L, PC, PT) is the same as in the Surveying guide.
3. Vertical curves and grades
Rise = grade × length. A +3% grade over 2,000 ft rises 60 ft. A parabolic curve has K = L/A; crest curves are controlled by stopping sight distance and sag curves by headlight distance and comfort.
4. Traffic flow
Three basic variables: flow q (veh/h), density k (veh/mi) and space-mean speed v (mph).
The Greenshields model assumes speed falls linearly with density.
Greenshields
Given: v_f = 60 mph, k_j = 120 veh/mi.
Solution: at k = 30, v = 60(0.75) = 45 mph and q = 1,350 veh/h. The maximum flow is 60(120)/4 = 1,800 veh/h at k = 60.
Peak-hour factor: PHF = V/(4 V₁₅). Design hourly volume: DDHV = AADT × K × D, where K is the design-hour fraction and D the directional split.
Design volume
Given: AADT = 20,000, K = 0.10, D = 0.6.
Solution: DDHV = 20,000(0.10)(0.6) = 1,200 veh/h.
5. Capacity and level of service
Level of service (LOS) grades operation from A (free flow) to F (breakdown) based on density, delay or speed. The volume-to-capacity ratio is v/c; above 1.0 the demand exceeds capacity and queues form.
6. Traffic signals
Webster's equation gives the cycle length that minimizes delay:
L is the total lost time per cycle and Y the sum of the critical flow ratios. Green time is split in proportion to the critical flow ratios. Yellow plus all-red intervals provide clearance.
Optimum cycle
Given: L = 12 s, Y = 0.6.
Solution: C = (18 + 5)/0.4 = 57.5 s.
7. Pavement design
Flexible pavements carry load through layers and are designed using the cumulative equivalent single-axle loads (ESALs). Each truck passage is converted using a load equivalency (truck) factor.
ESALs
Given: 500 trucks per day, truck factor 0.8, 20-year life, no traffic growth.
Solution: 500 × 365 × 0.8 = 146,000 ESAL/yr, so 2.92 million over 20 years.
Rigid pavements use concrete slabs with joints and dowels. Subgrade strength (CBR or resilient modulus) controls required thickness.
8. Planning and safety
The four-step travel-demand model: trip generation, trip distribution, mode choice and route assignment. Trip generation uses rates such as 9.5 trips per 1,000 ft² of floor area; 40,000 ft² produces 380 trips. Crash analysis identifies hazardous locations with crash rates per million vehicle-miles.
Common mistakes
- Using speeds in ft/s in an equation written for mph.
- Forgetting the sign of the grade in SSD.
- Using the daily volume instead of the peak-hour volume for capacity.
- Mixing density and flow (q = kv).
- Using total cycle length without subtracting lost time when splitting green.
Exam strategy
Write the units under each symbol before substituting. For traffic questions, identify which of q, k and v are given. A quick check: the maximum flow on a freeway lane is on the order of 2,000 veh/h.
Checklist
- [ ] I can compute stopping sight distance with grades.
- [ ] I can relate superelevation, friction, speed and radius.
- [ ] I can apply q = kv, the Greenshields model, PHF and DDHV.
- [ ] I can find the Webster cycle length.
- [ ] I can compute ESALs and trip generation.
Formula summary
- Stopping sight distance
- SSD = 1.47Vt + V²/[30(f ± G)]
- Flow
- q = k · v
- Greenshields max flow
- q_max = v_f k_j / 4
- Peak-hour factor
- PHF = V / (4 V₁₅)
- Curve
- e + f = V² / (15 R)
- Webster cycle
- C = (1.5L + 5)/(1 − Y)
Worked problems
1. Using SSD = 1.47Vt + V²/[30(f + G)], find the stopping sight distance for V = 60 mph, t = 2.5 s, f = 0.35 on level ground (G = 0).
- 342 ft
- 450 ft
- 563 ft
- 720 ft
Answer: C. Reaction: 1.47(60)(2.5) = 220.5 ft. Braking: 3600/(30 × 0.35) = 342.9 ft. SSD = 563 ft.
2. A highway has a density of 40 veh/mi and a space-mean speed of 45 mph. The flow is:
- 0.9 veh/h
- 85 veh/h
- 1,800 veh/h
- 3,600 veh/h
Answer: C. q = kv = 40 × 45 = 1,800 veh/h.
3. A peak hour has 1,000 vehicles, and the busiest 15 minutes has 300. The PHF is:
- 0.75
- 0.83
- 0.90
- 1.20
Answer: B. PHF = 1000/(4 × 300) = 0.833.
4. A curve has R = 800 ft and V = 45 mph. If side friction is 0.12, the required superelevation is closest to:
- 0.049
- 0.12
- 0.169
- 0.289
Answer: A. e + f = 45²/(15 × 800) = 0.169; e = 0.169 − 0.12 = 0.049 (4.9%).
5. A signal has total lost time L = 12 s per cycle and Y = 0.6. Webster’s optimum cycle length is:
- 23 s
- 40 s
- 57.5 s
- 120 s
Answer: C. C = (1.5 × 12 + 5)/(1 − 0.6) = 23/0.4 = 57.5 s.
6. Under the Greenshields model with free-flow speed 60 mph and jam density 120 veh/mi, the maximum flow is:
- 1,800 veh/h
- 3,600 veh/h
- 7,200 veh/h
- 900 veh/h
Answer: A. q_max = v_f k_j/4 = 60(120)/4 = 1,800 veh/h at k = 60 veh/mi.
7. A +3% grade extends 2,000 ft. The elevation gain is:
- 6 ft
- 30 ft
- 60 ft
- 600 ft
Answer: C. 0.03 × 2,000 = 60 ft.
8. A lane carries 1,200 veh/h. The average time headway is:
- 1.5 s
- 3 s
- 6 s
- 12 s
Answer: B. 3,600/1,200 = 3 s per vehicle.
9. A development has 40,000 ft² of floor area (40 ksf) and a trip generation rate of 9.5 trips/ksf. Trips generated are:
- 237
- 380
- 475
- 3,800
Answer: B. 9.5 × 40 = 380 trips.
10. A road carries 500 trucks/day with a truck factor of 0.8 ESAL/truck for 20 years (no growth). The design ESALs are closest to:
- 146,000
- 2.92 million
- 3.65 million
- 5.84 million
Answer: B. 500 × 365 × 0.8 = 146,000/yr; × 20 = 2.92 million.
11. Using SSD = 1.47Vt + V²/[30(f ± G)], find SSD for V = 50 mph, t = 2.5 s, f = 0.35 on a 4% downgrade:
- 380 ft
- 453 ft
- 520 ft
- 560 ft
Answer: B. Reaction: 1.47(50)(2.5) = 183.8 ft. Braking: 2500/[30(0.35 − 0.04)] = 268.8 ft. Total = 452.6 ft.
12. Using R = V²/[15(e + f)] with V = 60 mph, e = 0.08 and f = 0.12, the minimum radius is:
- 800 ft
- 1,200 ft
- 1,800 ft
- 2,400 ft
Answer: B. R = 3,600/(15 × 0.20) = 1,200 ft.
13. Level of service F on a freeway indicates:
- Free-flow operation
- Stable flow with slight delays
- Breakdown flow with demand exceeding capacity
- Capacity flow at a signal
Answer: C. LOS F is forced or breakdown flow, with queues forming.
14. An approach has a demand of 900 veh/h and a capacity of 1,200 veh/h. The volume-to-capacity ratio is:
- 0.25
- 0.75
- 1.0
- 1.33
Answer: B. v/c = 900/1,200 = 0.75.
15. AADT = 20,000, K = 0.10 and D = 0.6. The directional design hourly volume is:
- 600
- 1,200
- 2,000
- 12,000
Answer: B. DDHV = AADT × K × D = 20,000 × 0.10 × 0.6 = 1,200 veh/h.
Chapter 8 · approx. 8–12%
Construction Engineering & Management
Overview
Construction engineering and management covers scheduling, cost control, equipment production, earthwork and safety. FE questions are short: a critical-path network, an earned-value index, a production rate, or an OSHA rule. Practise drawing the network and keeping bank, loose and compacted volumes separate.
1. Critical path method (CPM)
Draw the network. Do a forward pass to find each activity's earliest start (ES) and earliest finish (EF = ES + duration), then a backward pass for latest finish (LF) and latest start (LS = LF − duration).
Activities with zero float form the critical path, the longest path, which sets the project duration. Free float is the delay possible without delaying the next activity's early start.
Small network
Given: A (3 d) is first. B (4 d) and C (2 d) both follow A. D (5 d) follows B and C.
Solution: forward pass: A: ES 0, EF 3. B: ES 3, EF 7. C: ES 3, EF 5. D: ES 7 (the later of 7 and 5), EF 12. Project duration is 12 days. Critical path A–B–D. Float of C = 7 − 5 = 2 days.
2. Crashing and time–cost trade-off
To shorten a project, crash the critical activity with the lowest cost slope.
Cost slope
Given: normal 10 d for $5,000; crash 8 d for $6,200.
Solution: slope = 1,200/2 = $600 per day.
Remember that crashing a non-critical activity does not shorten the project, and the critical path may change as you crash.
3. Earned value management
Three baseline numbers: planned value PV, earned value EV (budgeted cost of work done) and actual cost AC.
Indices below 1.0 mean over budget or behind schedule.
Earned value
Given: BAC = $1,000,000, EV = $400,000, AC = $500,000, PV = $450,000.
Solution: CPI = 0.80 and SPI = 0.89. EAC = 1,000,000/0.80 = $1,250,000. ETC = $750,000. VAC = −$250,000.
4. Estimating and economics
A bid starts with quantity take-off, unit prices for labor, materials and equipment, then overhead and profit. Labor cost per unit = (crew hourly cost)/(production per hour). Break-even quantity = fixed cost/(price − variable cost).
Labor unit cost
Given: a crew of 3 at $40/hr each places 120 ft²/hr.
Solution: $120/hr ÷ 120 ft²/hr = $1.00 per ft².
5. Equipment and earthwork
Production = capacity × cycles per hour × efficiency. Cycles per hour = 3,600/cycle time (seconds); a 50-minute hour is an efficiency of 0.83.
Excavator production
Given: a 2 yd³ bucket, 30 s cycle, 50-min hour.
Solution: cycles = 3600/30 = 120 per hour. Production = 2(120)(0.833) = 200 loose yd³/hr.
Soil volume changes by condition. Swell: loose volume = bank volume × (1 + swell). Shrinkage: compacted volume = bank volume × (1 − shrinkage).
Swell and shrinkage
Given: 1,000 bank yd³ with 25% swell and 15% shrinkage.
Solution: loose = 1,250 yd³ (what trucks haul); compacted = 850 yd³ (what fills the embankment).
Concrete quantity: volume in ft³ ÷ 27 = yd³. A 40 ft × 30 ft slab 6 in thick is 600 ft³ = 22.2 yd³.
6. Safety (OSHA)
- Fall protection: required at unprotected edges 6 ft or more above a lower level in construction (4 ft in general industry).
- Trenching: a protective system (sloping, shoring or shielding) is required at 5 ft or deeper, unless the trench is in stable rock; a competent person inspects daily; a ladder or ramp must be within 25 ft of workers in a trench 4 ft or deeper.
- Hazard communication, PPE and scaffolding rules also apply; the hierarchy of controls favors eliminating the hazard first.
7. Contracts and delivery
| Contract | Who carries cost risk |
|---|---|
| Lump sum | contractor |
| Unit price | shared; owner for quantity changes |
| Cost-plus | owner |
| Guaranteed maximum price | contractor above the cap |
Delivery methods: design–bid–build, design–build and construction manager at risk. Bid, performance and payment bonds protect the owner and subcontractors.
Common mistakes
- Using the wrong volume state (bank, loose, compacted).
- Taking the shorter path through a merge as the critical path.
- Forgetting that float is zero on the critical path only.
- Using EV/PV for cost and EV/AC for schedule (reversed).
- Mixing the OSHA heights for construction and general industry.
Exam strategy
Draw the network and list ES, EF, LS and LF in a table. For earned value, write the three baselines and compute each index separately. For production, write units through the calculation.
Checklist
- [ ] I can run a forward and backward pass and find float.
- [ ] I can compute CPI, SPI, EAC and VAC.
- [ ] I can find equipment production and soil volume changes.
- [ ] I know the key OSHA heights and trench rules.
- [ ] I can compare contract types by risk.
Formula summary
- Total float
- TF = LS − ES = LF − EF
- Cost performance index
- CPI = EV / AC
- Schedule performance index
- SPI = EV / PV
- Swell
- V_loose = V_bank (1 + swell)
- Production
- P = capacity × (3600/t_cycle) × efficiency
Worked problems
1. Activities: A (3 d); B (4 d) follows A; C (2 d) follows A; D (5 d) follows B and C. The project duration is:
- 9 days
- 10 days
- 12 days
- 14 days
Answer: C. Longest path A → B → D = 3 + 4 + 5 = 12 days.
2. In that network, the total float of activity C is:
- 0 days
- 2 days
- 4 days
- 5 days
Answer: B. Path A–C–D is 10 days vs. the 12-day critical path, so C has 2 days of float.
3. A project has EV = $80,000 and AC = $100,000. The cost performance index is:
- 0.80
- 1.00
- 1.25
- 1.80
Answer: A. CPI = EV/AC = 80/100 = 0.80, meaning over budget.
4. A project has EV = $80,000 and PV = $90,000. The SPI is closest to:
- 0.80
- 0.89
- 1.13
- 1.25
Answer: B. SPI = 80/90 = 0.889, behind schedule.
5. A 1,000 bank yd³ of soil has 25% swell. The loose volume is:
- 750 yd³
- 800 yd³
- 1,000 yd³
- 1,250 yd³
Answer: D. V_loose = 1,000(1.25) = 1,250 yd³.
6. A 2 yd³ bucket has a 30 s cycle time and a 50-min-per-hour efficiency. The production is closest to:
- 100 yd³/h
- 200 yd³/h
- 300 yd³/h
- 480 yd³/h
Answer: B. Cycles/hr = 3600/30 = 120. P = 2 × 120 × (50/60) = 200 yd³/h.
7. OSHA generally requires a protective system for trenches at what depth (unless in stable rock)?
- 2 ft or deeper
- 5 ft or deeper
- 10 ft or deeper
- 15 ft or deeper
Answer: B. Excavations 5 ft or deeper require a protective system (sloping, shoring or shielding) unless in stable rock.
8. An activity has ES = 12, duration = 5 and LF = 20. Its total float is:
- 3
- 5
- 8
- 15
Answer: A. EF = 17; LS = LF − D = 15; TF = LS − ES = 3 days.
9. Fixed costs are $50,000, the unit price is $30 and the variable cost is $20 per unit. The break-even quantity is:
- 1,667
- 2,500
- 5,000
- 10,000
Answer: C. BE = 50,000/(30 − 20) = 5,000 units.
10. A slab 40 ft × 30 ft × 6 in thick requires concrete of closest to:
- 11.1 yd³
- 22.2 yd³
- 44.4 yd³
- 600 yd³
Answer: B. 40 × 30 × 0.5 = 600 ft³ ÷ 27 = 22.2 yd³.
11. A crew of 3 workers at $40/hr each places 120 ft²/hr. The labor cost per ft² is:
- $0.33
- $1.00
- $3.00
- $40
Answer: B. 3 × 40 = $120/hr ÷ 120 ft²/hr = $1.00/ft².
12. BAC = $1,000,000 and CPI = 0.80. The estimate at completion (EAC = BAC/CPI) is:
- $800,000
- $1,000,000
- $1,200,000
- $1,250,000
Answer: D. EAC = 1,000,000/0.80 = $1,250,000.
13. OSHA construction standards generally require fall protection at unprotected edges at heights of:
- 4 ft
- 6 ft
- 10 ft
- 15 ft
Answer: B. In construction the trigger height is 6 ft (general industry is 4 ft).
14. Which contract type places most of the cost-overrun risk on the contractor?
- Cost-plus-fee
- Time and materials
- Lump sum (fixed price)
- Cost-plus-percentage
Answer: C. Under a lump-sum contract the price is fixed, so overruns fall on the contractor.
15. Soil has 15% shrinkage (compacted volume = 85% of bank volume). 1,000 bank yd³ yields how much compacted fill?
- 750 yd³
- 850 yd³
- 1,000 yd³
- 1,150 yd³
Answer: B. 1,000 × 0.85 = 850 compacted yd³.
Chapter 9 · approx. 4–7% (with Materials)
Construction Materials: Concrete, Aggregate & Asphalt
Overview
Construction materials questions focus on concrete and its ingredients, aggregates, asphalt, steel and timber. They test definitions, standard tests and a few short calculations (strength from a cylinder, water–cement ratio, absorption, fineness modulus, mix proportions).
1. Concrete basics
Concrete = cement + water + aggregates (+ admixtures). Hydration of cement and water produces strength over time; the 28-day compressive strength f′_c is the reference.
- Water–cement ratio w/c = weight of water ÷ weight of cement. Lower w/c means higher strength and lower permeability (Abrams' law); adding water on site hurts strength and durability.
- Workability is measured by the slump test; higher slump means a wetter, more fluid mix.
- Air entrainment (4–7%) improves freeze–thaw durability but slightly lowers strength.
- Curing keeps concrete moist and warm so hydration continues.
Cylinder strength
Given: a 6 in diameter cylinder fails at 90,000 lb.
Solution: A = π(6)²/4 = 28.27 in². f′_c = 90,000/28.27 = 3,183 psi.
Normal-weight concrete weighs about 150 lb/ft³; 10 yd³ (270 ft³) is about 40,500 lb. Elastic modulus E_c = 57,000√f′_c psi.
2. Mix design (absolute volume method)
Each ingredient occupies a volume = weight ÷ (specific gravity × 62.4 lb/ft³). The volumes of cement, water, air and aggregates add up to 27 ft³ per cubic yard.
Absolute-volume mix
Given: per yd³: cement 564 lb (SG 3.15), water 282 lb, air 6%, aggregates SG 2.65 with sand 40% of the aggregate volume.
Solution: cement 564/(3.15 × 62.4) = 2.87 ft³; water 282/62.4 = 4.52 ft³; air 0.06 × 27 = 1.62 ft³. Aggregate volume = 27 − 2.87 − 4.52 − 1.62 = 17.99 ft³. Sand = 0.4(17.99) = 7.20 ft³ → 7.20(2.65)(62.4) = 1,190 lb. Gravel = 10.79 ft³ → 1,785 lb.
3. Aggregates
- Gradation: sieve analysis gives percent passing = 100 − cumulative percent retained.
- Fineness modulus FM = Σ(cumulative % retained on the standard sieves)/100; fine sand about 2.3–3.1.
- Absorption = (SSD mass − oven-dry mass)/oven-dry mass × 100. The saturated-surface-dry (SSD) state is the reference condition for mix design.
Fineness modulus
Given: cumulative percent retained on #4, #8, #16, #30, #50, #100: 3, 15, 35, 60, 85, 97.
Solution: sum = 295, so FM = 2.95.
Moisture correction: stockpile aggregate carries free moisture. Wet weight = SSD weight × (1 + MC)/(1 + Abs); subtract the free water from the mixing water.
Moisture correction
Given: a batch needs 1,190 lb of SSD sand. Stockpile moisture content = 5%, absorption = 1%.
Solution: wet sand = 1,190(1.05)/(1.01) = 1,237 lb. Free water = 1,237 − 1,190 = 47 lb, so reduce the mixing water by 47 lb.
4. Asphalt
Asphalt concrete is aggregate bound with asphalt binder. Binder is graded by performance grade PG X−Y: X is the 7-day maximum pavement temperature (°C) and Y is the minimum (°C), so PG 64−22 resists rutting to 64 °C and cracking to −22 °C. Mix design (Marshall or Superpave) targets about 4% air voids and adequate voids in mineral aggregate. Too much binder causes bleeding and rutting; too little causes raveling and cracking.
5. Steel
Mild steel has a distinct yield plateau; high-strength steels use the 0.2% offset yield. Modulus is about 29,000 ksi (200 GPa) for all steels. Common grades: A36 (F_y = 36 ksi) and A992 (F_y = 50 ksi). Rebar is graded by yield strength (Grade 60 means 60 ksi), and bar number = diameter in eighths of an inch. Strain in the elastic range: ε = σ/E; 36 ksi gives ε = 0.00124.
Thermal expansion: ΔL = αLΔT. For concrete α ≈ 5.5×10⁻⁶ per °F, so a 100 ft slab warming by 60 °F grows 0.40 in; steel and concrete have similar α, which makes reinforced concrete work.
6. Timber and masonry
Timber strength depends on species, grade, moisture content and load duration. Moisture content = (wet weight − dry weight)/dry weight. A sample weighing 12 lb wet and 10 lb dry has MC = 20%. Wood shrinks as it dries and is strongest parallel to the grain. Masonry (brick, concrete block) is strong in compression and requires reinforcing and mortar of suitable type.
7. Standard tests at a glance
| Test | Measures |
|---|---|
| Slump | workability of fresh concrete |
| Compression cylinder | f′_c at 7, 28 days |
| Sieve analysis | aggregate gradation |
| Proctor | maximum dry density of soil |
| Marshall | asphalt stability and flow |
| Charpy | impact toughness |
Common mistakes
- Using the weight of water-to-total instead of water-to-cement in w/c.
- Forgetting the 62.4 lb/ft³ factor when converting weight to volume.
- Calling the passing percentage the retained percentage.
- Forgetting that free moisture in aggregate adds water to the mix.
- Mixing PG temperature units (they are °C).
Exam strategy
Group each question by material, recall the one standard test or formula that applies, and write the units. When a choice suggests adding water to improve workability, it is almost always wrong.
Checklist
- [ ] I can compute w/c, cylinder strength and the modulus of concrete.
- [ ] I can compute fineness modulus, absorption and moisture corrections.
- [ ] I can proportion a mix by the absolute volume method.
- [ ] I can interpret an asphalt PG grade.
- [ ] I know the common steel grades and rebar sizes.
Formula summary
- Water–cement ratio
- w/c = W_water / W_cement
- Compressive strength
- f′_c = P / A
- Absorption
- (SSD − OD) / OD × 100
- Fineness modulus
- FM = Σ cum. % retained / 100
Worked problems
1. A mix has 300 lb of water and 600 lb of cement. The water–cement ratio is:
- 0.25
- 0.50
- 1.00
- 2.00
Answer: B. w/c = 300/600 = 0.50.
2. A 6-in diameter concrete cylinder fails at 90,000 lb. The compressive strength is closest to:
- 1,600 psi
- 2,400 psi
- 3,180 psi
- 5,000 psi
Answer: C. A = π(6)²/4 = 28.27 in². f′_c = 90,000/28.27 = 3,183 psi.
3. An aggregate sample has SSD mass 1,050 g and oven-dry mass 1,000 g. The absorption is:
- 4.8%
- 5.0%
- 5.3%
- 50%
Answer: B. (1050 − 1000)/1000 × 100 = 5.0%.
4. Cumulative percentages retained on #4, #8, #16, #30, #50 and #100 sieves are 3, 15, 35, 60, 85 and 97. The fineness modulus is:
- 2.50
- 2.95
- 3.40
- 295
Answer: B. Sum = 295; FM = 295/100 = 2.95.
5. A binder graded PG 64−22 is designed for a high pavement temperature and low temperature of:
- 64 °F and −22 °F
- 64 °C and −22 °C
- 22 °C and 64 °C
- 64 °C and 22 °C above freezing
Answer: B. The first number is the 7-day maximum pavement temperature (°C); the second is the minimum (°C).
6. Adding extra water to fresh concrete on site to improve workability will generally:
- Increase strength
- Reduce strength and durability
- Have no effect on strength
- Speed up curing
Answer: B. A higher w/c ratio lowers strength and increases permeability.
7. The slump test measures a concrete’s:
- Compressive strength
- Air content
- Workability
- Setting time
Answer: C. Slump is a measure of consistency or workability of fresh concrete.
8. In absolute-volume mix design, 564 lb of cement (specific gravity 3.15) occupies, with water at 62.4 lb/ft³:
- 1.2 ft³
- 2.87 ft³
- 5.7 ft³
- 8.9 ft³
Answer: B. V = 564/(3.15 × 62.4) = 2.87 ft³.
9. Steel (E = 29,000 ksi) is stressed to 36 ksi, within the elastic range. The strain is:
- 0.00080
- 0.00124
- 0.00360
- 0.01240
Answer: B. ε = σ/E = 36/29,000 = 0.00124.
10. If the cumulative percent retained on a sieve is 35%, the percent passing is:
- 35%
- 65%
- 100%
- 135%
Answer: B. Passing = 100 − 35 = 65%.
11. A 100 ft concrete slab (α = 5.5×10⁻⁶ per °F) warms by 60 °F. The unrestrained expansion is closest to:
- 0.04 in
- 0.40 in
- 3.96 in
- 4.0 ft
Answer: B. ΔL = αLΔT = 5.5×10⁻⁶(1200 in)(60) = 0.396 in.
12. A timber sample weighs 12 lb wet and 10 lb oven-dry. Its moisture content is:
- 2%
- 12%
- 16.7%
- 20%
Answer: D. MC = (12 − 10)/10 = 20% (based on dry weight).
13. The nominal diameter of a #8 reinforcing bar is:
- 0.5 in
- 0.75 in
- 1.0 in
- 1.25 in
Answer: C. Bar number = diameter in eighths of an inch: #8 = 8/8 = 1.0 in.
14. The main purpose of air entrainment in concrete is to improve:
- Early strength
- Freeze–thaw durability
- Modulus of elasticity
- Density
Answer: B. Tiny air bubbles relieve pressure from freezing water and improve scaling and freeze–thaw resistance.
15. Normal-weight concrete weighs about 150 lb/ft³. 10 yd³ weighs about:
- 1,500 lb
- 4,050 lb
- 40,500 lb
- 150,000 lb
Answer: C. 10 yd³ = 270 ft³; 270 × 150 = 40,500 lb.
Chapter 10 · ~6–9% of exam
Mathematics
Overview
Mathematics supports every other FE topic, so speed matters more than depth. Expect short problems: differentiate or integrate a function, find eigenvalues, solve a first-order differential equation, take a dot or cross product, or run one step of a numerical method. This guide reviews each tool, shows the shortest route, and lists the traps.
1. Differentiation
The rules you need are the product, quotient and chain rules, plus a handful of standard derivatives.
| Function | Derivative |
|---|---|
| xⁿ | n xⁿ⁻¹ |
| eˣ | eˣ |
| ln x | 1/x |
| sin x | cos x |
| cos x | −sin x |
| tan x | sec² x |
A maximum or minimum of f occurs where f' = 0. It is a minimum if f'' > 0 and a maximum if f'' < 0.
Product rule with a logarithm
Given: f(x) = x³ ln x. Find f'(1).
Solution: f' = 3x² ln x + x³ · (1/x) = 3x² ln x + x². At x = 1 the log term vanishes, so f'(1) = 1.
2. Integration
Standard integrals: ∫xⁿ dx = xⁿ⁺¹/(n+1), ∫1/x dx = ln|x|, ∫eˣ dx = eˣ, ∫sin x dx = −cos x, ∫cos x dx = sin x. Two techniques cover almost every exam problem.
- Substitution: let u = g(x) when the integrand contains g'(x).
- By parts: ∫u dv = uv − ∫v du. Choose u as the part that gets simpler when differentiated (a log or a polynomial).
Integration by parts
Given: ∫ x ln x dx.
Solution: Let u = ln x and dv = x dx, so du = dx/x and v = x²/2.
For a definite integral, evaluate the antiderivative at both limits. The identity sin²x = (1 − cos 2x)/2 makes ∫sin²x dx easy.
3. Limits and series
L'Hôpital's rule: if a limit gives 0/0 or ∞/∞, differentiate the numerator and denominator separately and try again. A geometric series a + ar + ar² + … sums to a/(1 − r) when |r| < 1. The Maclaurin series for eˣ is 1 + x + x²/2! + x³/3! + …, and for sin x it is x − x³/3! + x⁵/5! − …
4. Matrices and linear algebra
- Matrix product: row of the first times column of the second. Order matters (AB ≠ BA in general).
- 2×2 determinant: ad − bc. Inverse: swap a and d, negate b and c, divide by the determinant.
- 3×3 determinant: expand along a row, with alternating signs +, −, +.
- Eigenvalues solve det(A − λI) = 0. For a 2×2 matrix the eigenvalues sum to the trace and multiply to the determinant, which gives an instant check.
Eigenvalues of a 2×2 matrix
Given: A = [[4, 1], [2, 3]].
Solution: trace = 7 and determinant = 12 − 2 = 10, so λ² − 7λ + 10 = 0, giving λ = 2 and λ = 5.
For a linear system Ax = b, use Cramer's rule on 2×2 systems or Gaussian elimination on larger ones. A zero determinant means no unique solution.
5. Ordinary differential equations
First order
A separable equation lets you move all y terms to one side and all x terms to the other, then integrate. A linear equation y' + p(x)y = q(x) uses the integrating factor μ = e^(∫p dx).
Linear first-order ODE
Given: y' + 2y = 6, y(0) = 1.
Solution: integrating factor e²ˣ gives (y e²ˣ)' = 6e²ˣ, so y e²ˣ = 3e²ˣ + C and y = 3 + Ce⁻²ˣ. From y(0) = 1, C = −2.
Answer: y = 3 − 2e⁻²ˣ.
Second order with constant coefficients
For y'' + ay' + by = 0, write the characteristic equation r² + ar + b = 0.
| Roots | General solution |
|---|---|
| Two real, r₁ ≠ r₂ | C₁e^(r₁x) + C₂e^(r₂x) |
| Repeated, r | (C₁ + C₂x)e^(rx) |
| Complex, α ± βi | e^(αx)(C₁cos βx + C₂sin βx) |
6. Vectors
The dot product is a scalar and is zero for perpendicular vectors. The cross product is a vector perpendicular to both inputs; its magnitude is the area of the parallelogram they span.
7. Numerical methods
- Newton's method for f(x) = 0: x_new = x − f(x)/f'(x).
- Trapezoidal rule: ∫f dx ≈ (h/2)[f₀ + 2f₁ + … + 2f(n−1) + fₙ].
- Euler's method for y' = f(x, y): y_new = y + h·f(x, y).
Newton's method
Given: solve x² − 2 = 0 starting at x₀ = 1.5.
Solution: x₁ = 1.5 − (0.25)/(3.0) = 1.4167. The true root is 1.4142, so one step is already close.
Trapezoidal rule
Given: ∫₀² x² dx with two strips (h = 1).
Solution: (1/2)[0 + 2(1) + 4] = 3. The exact value is 8/3 = 2.667, so the rule overestimates a convex function.
Common mistakes
- Forgetting the chain-rule factor g'(x), especially with sin(x²) or e^(3x).
- Dropping the constant of integration, or forgetting to change limits after a substitution.
- Treating AB = BA for matrices.
- Using degrees in a calculator set to radians (or the reverse).
- Taking the dot product when the question asks for the cross product.
Exam strategy
Most math questions take under two minutes. Use the eigenvalue trace/determinant check, plug numbers into answer choices when the algebra is long, and never spend more than three minutes on one problem. Check the calculator angle mode first.
Checklist
- [ ] I can differentiate products, quotients and compositions without notes.
- [ ] I can integrate by substitution and by parts.
- [ ] I can find eigenvalues of a 2×2 and a determinant of a 3×3.
- [ ] I can solve a linear first-order ODE and a constant-coefficient second-order ODE.
- [ ] I can run one step of Newton's method and the trapezoidal rule.
Formula summary
- Product rule
- (uv)' = u'v + uv'
- Eigenvalues
- det(A − λI) = 0
- First-order ODE
- y' + ky = 0 → y = y₀ e^(−kx)
- Dot product
- A·B = AxBx + AyBy + AzBz
Worked problems
1. If f(x) = x³ ln x, what is f′(1)?
- 0
- 1
- 3
- e
Answer: B. f′ = 3x² ln x + x³·(1/x) = 3x² ln x + x². At x = 1, ln 1 = 0, so f′(1) = 1.
2. Evaluate ∫₀^π sin²x dx.
- 0
- π
- π/2
- 2
Answer: C. sin²x = (1 − cos 2x)/2, so the integral is [x/2 − sin 2x/4] from 0 to π = π/2.
3. The eigenvalues of the matrix [[2, 1], [1, 2]] are:
- 1 and 3
- 0 and 4
- 2 and 2
- −1 and 3
Answer: A. det(A − λI) = (2−λ)² − 1 = 0 → λ = 1 or 3. Check: trace = 4, determinant = 3.
4. Solve y′ + 2y = 0 with y(0) = 3. What is y(1)?
- 1.10
- 0.41
- 0.15
- 6.00
Answer: B. y = 3e^(−2x). y(1) = 3e^(−2) = 3(0.1353) = 0.406 ≈ 0.41.
5. The determinant of [[1, 2, 3], [0, 4, 5], [1, 0, 6]] is:
- 38
- 14
- −22
- 22
Answer: D. Expand along row 1: 1(24 − 0) − 2(0 − 5) + 3(0 − 4) = 24 + 10 − 12 = 22.
6. For A = (1, 2, 3) and B = (4, −5, 6), the dot product A·B is:
- 4
- 12
- 32
- 18
Answer: B. 1(4) + 2(−5) + 3(6) = 4 − 10 + 18 = 12.
7. lim (x→0) sin(3x)/x equals:
- 0
- 1
- 3
- ∞
Answer: C. sin(3x)/x = 3·sin(3x)/(3x) → 3·1 = 3 (or by L’Hôpital: 3cos0 = 3).
8. Evaluate ∫₀¹ x eˣ dx.
- 1
- e − 1
- e
- 0
Answer: A. Integrate by parts: ∫x eˣ dx = x eˣ − eˣ. From 0 to 1: (e − e) − (0 − 1) = 1.
9. If f(x) = sin(x²), then f′(1) is closest to:
- 0.54
- 0.84
- 1.08
- 2.00
Answer: C. f′ = 2x cos(x²). At x = 1: 2cos(1) = 2(0.540) = 1.08.
10. The general solution of y″ − 4y = 0 is:
- y = Ae²ˣ + Be⁻²ˣ
- y = A cos 2x + B sin 2x
- y = Ae⁴ˣ + B
- y = (A + Bx)e²ˣ
Answer: A. The characteristic equation r² − 4 = 0 gives r = ±2, so y = Ae²ˣ + Be⁻²ˣ.
11. For A = [[2, 1], [5, 3]], the element in row 1, column 1 of A⁻¹ is:
- 1
- 2
- 3
- −5
Answer: C. det A = 6 − 5 = 1. A⁻¹ = (1/1)[[3, −1], [−5, 2]], so the (1,1) element is 3.
12. The angle between vectors A = (1, 1, 0) and B = (1, 0, 0) is:
- 30°
- 45°
- 60°
- 90°
Answer: B. cosθ = A·B/(|A||B|) = 1/(√2 · 1) = 0.707, so θ = 45°.
13. The sum of the infinite series Σ (1/2)ⁿ for n = 0, 1, 2, … is:
- 1
- 2
- 4
- It diverges
Answer: B. Geometric series with a = 1, r = 1/2: S = a/(1 − r) = 2.
Chapter 11 · ~4–6%
Probability & Statistics
Overview
Probability and statistics questions are short and formula-driven. You will describe a data set, use a distribution (normal, binomial, Poisson), build a confidence interval, run a hypothesis test, or fit a line. The key skill is recognising which tool a question wants.
1. Describing data
- Mean x̄ = Σx/n. Median is the middle value of the ordered data and resists outliers. Mode is the most frequent value.
- Sample variance s² = Σ(x − x̄)²/(n − 1); the standard deviation is its square root. Population variance divides by N.
- Range = max − min. IQR = Q3 − Q1.
Use the sample formula whenever the data are a sample from a larger group, which is the usual exam case.
2. Probability rules
Bayes' theorem reverses a conditional probability.
Bayes' theorem
Given: 1% of parts are defective. A test flags 95% of defective parts, and also flags 5% of good parts. A part is flagged. What is the chance it is defective?
Solution: defective and flagged: 0.01 × 0.95 = 0.0095. Good and flagged: 0.99 × 0.05 = 0.0495. Total flagged = 0.0590.
Answer: 0.0095/0.0590 = 0.161, only about 16%, because good parts vastly outnumber bad ones.
3. Counting
Permutations (order matters): P(n, r) = n!/(n − r)!. Combinations (order does not matter): C(n, r) = n!/[r!(n − r)!]. Ask yourself whether swapping two chosen items makes a different outcome.
4. Distributions
Binomial
n independent trials, each with success probability p.
Poisson
Counts of rare events at an average rate λ per interval.
Normal
Standardise with z = (x − μ)/σ and use the table. Memorise 68–95–99.7: about 68% lies within ±1σ, 95% within ±2σ and 99.7% within ±3σ. P(Z > 1.645) = 0.05 and P(Z > 1.96) = 0.025.
Student's t
Used instead of z when σ is unknown and n is small. It has heavier tails; the degrees of freedom are n − 1.
5. Sampling and the central limit theorem
The mean of n observations has standard error σ/√n and is approximately normal for large n whatever the population shape. Quadrupling the sample size halves the standard error.
6. Confidence intervals
Confidence interval with the t-distribution
Given: n = 16, x̄ = 20, s = 4. Find the 95% interval.
Solution: degrees of freedom = 15, t(0.025, 15) = 2.131. Half-width = 2.131 × 4/√16 = 2.13.
Answer: 20 ± 2.13, i.e. 17.87 to 22.13.
7. Hypothesis testing
- State H₀ (no effect) and H₁ (the claim).
- Choose the significance level α, commonly 0.05.
- Compute the test statistic, z = (x̄ − μ₀)/(σ/√n).
- Compare with the critical value or find the p-value. Reject H₀ if p < α.
A Type I error rejects a true H₀ (probability α). A Type II error fails to reject a false H₀ (probability β).
One-sample z test
Given: H₀: μ = 50. σ = 6, n = 36, x̄ = 52, α = 0.05 (two-sided).
Solution: z = (52 − 50)/(6/√36) = 2.0, which exceeds 1.96, and the two-sided p-value is 0.0455.
Answer: reject H₀; the mean differs from 50.
8. Regression and correlation
Least squares line y = a + bx with slope b = Sxy/Sxx and intercept a = ȳ − b x̄. The correlation r runs from −1 to +1, and r² is the fraction of variation explained.
Least-squares line
Given: x = 1, 2, 3, 4, 5 and y = 2, 4, 5, 4, 5.
Solution: x̄ = 3 and ȳ = 4. Sxy = Σ(x − 3)(y − 4) = 6 and Sxx = 10, so b = 0.6 and a = 4 − 0.6(3) = 2.2.
Answer: y = 2.2 + 0.6x.
Common mistakes
- Using n instead of n − 1 for a sample standard deviation.
- Adding probabilities of events that are not mutually exclusive without subtracting the overlap.
- Using combinations when order matters.
- Using z when σ is estimated from a small sample.
- Reading a one-sided table value for a two-sided test.
Exam strategy
Identify the distribution first (counts of successes = binomial, rare events per interval = Poisson, continuous measurements = normal). Draw the bell curve and shade the area, because it prevents upper-tail and lower-tail mix-ups.
Checklist
- [ ] I can compute mean, median and sample standard deviation.
- [ ] I can use binomial, Poisson and normal probabilities.
- [ ] I can build a confidence interval with z or t.
- [ ] I can carry out a one-sample hypothesis test.
- [ ] I can fit a least-squares line.
Formula summary
- Sample std dev
- s = √[ Σ(x − x̄)² / (n − 1) ]
- z-score
- z = (x − μ)/σ
- Binomial
- P(X=k) = C(n,k) pᵏ (1−p)ⁿ⁻ᵏ
- CI (σ known)
- x̄ ± z·σ/√n
Worked problems
1. The sample standard deviation of 4, 8, 6, 5, 7 is:
- 1.41
- 2.00
- 2.50
- 1.58
Answer: D. Mean = 6. Σ(x−x̄)² = 4+4+0+1+1 = 10. s² = 10/4 = 2.5, s = 1.58. (1.41 is the population value.)
2. Two fair dice are rolled. The probability that the sum is 7 is:
- 1/12
- 1/9
- 1/6
- 5/36
Answer: C. Six of the 36 outcomes sum to 7: 6/36 = 1/6.
3. X is normal with μ = 100 and σ = 15. P(X > 115) is approximately:
- 0.023
- 0.159
- 0.317
- 0.341
Answer: B. z = (115−100)/15 = 1.0. Upper tail P(Z > 1) ≈ 0.159.
4. A fair coin is flipped 5 times. P(exactly 2 heads) is:
- 0.2500
- 0.3125
- 0.1875
- 0.5000
Answer: B. C(5,2)(0.5)⁵ = 10/32 = 0.3125.
5. How many ways can a committee of 3 be chosen from 8 people?
- 24
- 28
- 56
- 336
Answer: C. C(8,3) = 8!/(3!5!) = 56. (336 would be ordered selections.)
6. A sample of n = 25 has mean 50, with known σ = 10. The half-width of the 95% confidence interval is:
- 1.96
- 3.92
- 7.84
- 2.00
Answer: B. Half-width = 1.96 × 10/√25 = 1.96 × 2 = 3.92.
7. The median of the data set 2, 3, 5, 7, 20 is:
- 3
- 5
- 7.4
- 20
Answer: B. The middle value of the ordered data is 5. (The mean is 7.4, pulled up by the outlier.)
8. Arrivals follow a Poisson process with a mean of 2 per hour. The probability of no arrivals in an hour is:
- 0.135
- 0.271
- 0.368
- 0.865
Answer: A. P(0) = e⁻² = 0.135.
9. For a normal distribution, the probability that X lies within two standard deviations of the mean is approximately:
- 0.683
- 0.954
- 0.997
- 0.500
Answer: B. About 68.3% lie within ±1σ, 95.4% within ±2σ and 99.7% within ±3σ.
10. A discrete variable takes values 1, 2, 3 with probabilities 0.2, 0.5, 0.3. Its expected value is:
- 1.9
- 2.0
- 2.1
- 2.3
Answer: C. E[X] = 1(0.2) + 2(0.5) + 3(0.3) = 0.2 + 1.0 + 0.9 = 2.1.
11. Independent events A and B have P(A) = 0.3 and P(B) = 0.4. P(A or B) is:
- 0.12
- 0.58
- 0.70
- 0.42
Answer: B. P(A∪B) = 0.3 + 0.4 − (0.3)(0.4) = 0.58.
12. A regression has correlation coefficient r = −0.8. The coefficient of determination r² is:
- 0.64
- −0.64
- 0.80
- 0.36
Answer: A. r² = (−0.8)² = 0.64; 64% of the variation is explained by the fit.
Chapter 12 · ~4–6%
Ethics & Professional Practice
Overview
Ethics questions describe a short scenario and ask what an engineer should do. There is no calculation. You will do well if you learn the priority order of the professional codes and apply it calmly. The NCEES Model Rules of Professional Conduct and the NSPE Code of Ethics share the same core ideas.
1. The core hierarchy
When duties conflict, resolve them in this order.
- Protect the public: safety, health and welfare come first, above the client, employer and your own interests.
- Stay within the law and the rules of licensure.
- Be honest and objective in reports, testimony and public statements.
- Act competently: accept only work you are qualified to do.
- Serve client and employer faithfully, protecting confidential information and avoiding conflicts of interest.
- Maintain the reputation of the profession: give credit to others and do not compete unfairly.
2. Public safety and escalation
When you believe the public may be at risk:
- Document the concern clearly and factually.
- Raise it with your supervisor, then up the chain of command.
- If the risk remains and the employer or client refuses to act, notify the appropriate authority (the licensing board, a regulator or law enforcement).
Confidentiality does not override a serious threat to public safety. Staying silent to keep your job is never the answer.
3. Competence and licensure
- Perform services only in your areas of competence. If a project needs a specialty you lack, associate with qualified engineers or decline.
- Practising without the required license, or helping someone else do so, is a violation.
- Sealing: you may seal only documents you prepared, or that were prepared under your direct supervision and responsible charge. Never seal a colleague's unreviewed work as a favor.
- Keep your skills current through continuing education.
4. Conflicts of interest
A conflict exists when a personal, financial or business interest could influence professional judgment.
- Disclose it to the client or employer.
- Avoid it, or proceed only with informed consent from all affected parties.
- Do not accept payment from more than one party for the same project without everyone's knowledge.
- Do not accept or offer gifts, favors or entertainment that might influence a decision. A small value does not excuse it.
5. Honesty and public statements
Issue public statements only in an objective and truthful manner, based on adequate knowledge. State clearly when you are speaking for a client or employer. Never falsify data, qualifications or test results. If you discover that a colleague has falsified data, address it through proper channels; do not ignore it.
6. Confidentiality
You must not reveal a client's or employer's confidential information without consent. The exceptions are when disclosure is required by law, or when it is needed to prevent harm to the public.
7. Credit, plagiarism and fair competition
- Give credit to the engineers and sources whose work you use, and obtain permission where required.
- Do not falsely criticise another engineer's work or try to take their job through unfair means.
- Competitive bidding on qualifications and price is acceptable. Offering a bribe or kickback to win work is not.
8. A method for scenario questions
Reasoning through a scenario
Scenario: A manager asks you to approve a bridge inspection report although you have not inspected two of the piers.
Step 1, identify the interests: public safety, your license, your employer's schedule.
Step 2, apply the hierarchy: public safety and honest reporting outrank the schedule.
Step 3, choose the response that fixes the problem within the rules: decline to approve the incomplete report, explain why, and complete the inspection. If pressured to proceed, escalate and, if the risk is real, notify the authority.
When two answers both seem ethical, pick the one that protects the public first and stays within the law. Distrust answers that involve secrecy, shortcuts or personal gain.
Common mistakes
- Choosing loyalty to the employer over public safety.
- Treating a small gift as harmless.
- Assuming it is acceptable to seal work simply because the client has approved it.
- Going straight to the media or authorities before raising the issue internally (unless the danger is imminent).
- Selecting an answer that quietly fixes a problem without telling anyone who is affected.
Exam strategy
Read the last sentence first so you know what is being asked, then eliminate answers that break a core rule. The correct answer is usually the one that is honest, escalates properly and keeps everyone informed.
Checklist
- [ ] I can recite the priority order of professional duties.
- [ ] I know when and how to escalate a safety concern.
- [ ] I know the rules on sealing, competence and conflicts of interest.
- [ ] I know the limits of confidentiality.
- [ ] I can apply a step-by-step method to a scenario.
Worked problems
1. An engineer finds that a design flaw may endanger the public and the client refuses to correct it. The engineer should first:
- Keep quiet to honor client confidentiality
- Notify the client of the risk and, if unresolved, notify the appropriate authorities
- Resign without telling anyone
- Fix it silently and bill the client later
Answer: B. Public safety is paramount. The engineer should push for correction and, if the danger persists, notify authorities. Confidentiality does not override safety.
2. A civil engineer is offered a project that requires expertise in an unfamiliar specialty. The best response is to:
- Accept and learn on the job
- Accept but not tell the client
- Decline, or accept only with qualified associates for the unfamiliar portion
- Delegate the entire project to a technician
Answer: C. Engineers should perform services only in areas of their competence, or engage qualified specialists for the rest.
3. A contractor bidding on your agency’s project offers you tickets to a major sporting event. You should:
- Accept if the value is small
- Accept and disclose after award
- Accept only if your supervisor is also invited
- Decline, because the gift could appear to influence your judgment
Answer: D. Gifts from parties with a financial interest in your decisions create a conflict of interest or its appearance.
4. A licensed engineer may affix their seal to a set of drawings when:
- A colleague prepared them and asked for a favor
- They were prepared by the engineer or under the engineer’s direct supervision and responsible charge
- The client has approved them
- They are inexpensive projects
Answer: B. Sealing implies responsibility. It is only appropriate for work done by, or under the responsible charge of, the sealing engineer.
5. In a public statement about a controversial project, an engineer should:
- Emphasize only favorable data
- Be objective and truthful and disclose any financial interest
- Leave technical details out
- Defer all statements to the client
Answer: B. Public statements must be objective and truthful, and relevant interests must be disclosed.
6. An engineer may reveal confidential client information when:
- The client is late on payment
- A competitor asks
- Disclosure is required by law or is needed to protect public safety
- The engineer changes employers
Answer: C. Confidentiality has limits: law and public safety take precedence.
7. A manager asks you to seal plans you have not reviewed. You should:
- Seal them to keep the schedule
- Decline to seal work you have not prepared or directly supervised
- Seal them and add a disclaimer
- Ask a colleague to seal them instead
Answer: B. A seal certifies responsible charge. Sealing unreviewed work is improper.
8. You learn that a colleague falsified test data on a project. The best first step is to:
- Ignore it, since it is not your project
- Raise it with the colleague or supervisor and report to the proper authority if it is not corrected
- Post it on social media
- Quietly redo the tests yourself
Answer: B. Engineers must not tolerate deception that affects safety. Escalate through proper channels.
9. Using another engineer’s calculations in your own report without permission or credit is:
- Acceptable if they are standard methods
- A breach of professional ethics
- Required to save the client money
- Fine if the other engineer has left the firm
Answer: B. Engineers should give credit for work done by others and obtain permission where required.
10. You are a part-owner of a supplier whose product you are considering specifying. You should:
- Specify it without telling anyone
- Disclose the interest and avoid or obtain informed consent for the conflict
- Specify it because it saves time
- Drop the project quietly
Answer: B. Conflicts of interest must be disclosed to the client or employer.
11. Advertising by a licensed engineer may include:
- Exaggerated project claims
- Truthful descriptions of qualifications and services
- Claims of credentials not earned
- Guarantees that a bid will win
Answer: B. Advertising must be truthful and not misleading.
12. An engineer may offer a gift to a public official to win a contract when:
- The gift is small
- It is customary in the region
- Never; offering gifts to influence a contract award is unethical
- It is disclosed to a competitor
Answer: C. Engineers must not offer or give any gift or consideration to obtain work.
Chapter 13 · ~5–8%
Engineering Economics
Overview
Engineering economics asks you to compare money at different times and choose the best alternative. The core idea is that a dollar today is worth more than a dollar later. Most questions reduce to applying one or two interest factors from the Reference Handbook, so the goal is to know which factor to pick.
1. Cash-flow diagrams
Draw a time line. Put upward arrows for receipts and downward arrows for payments. Mark each period and decide whether each cash flow falls at the end of the period (the standard assumption). A diagram prevents most mistakes.
2. Single-payment factors
Notation: (F/P, i, n) multiplies a present amount to get a future amount; (P/F, i, n) does the reverse.
Future worth
Given: $10,000 at 6% compounded annually for 5 years.
Solution: F = 10,000(1.06)⁵ = 10,000(1.3382) = $13,382.
3. Uniform series (annuities)
| Factor | Converts | Used for |
|---|---|---|
| (P/A, i, n) | A to P | present worth of equal payments |
| (A/P, i, n) | P to A | loan or capital recovery |
| (F/A, i, n) | A to F | future value of savings |
| (A/F, i, n) | F to A | sinking fund |
The first payment of an ordinary annuity is one period after P.
Loan payment
Given: $50,000 borrowed at 8% for 5 years, equal year-end payments.
Solution: A = 50,000 × (A/P, 8%, 5) = 50,000 × 0.25046 = $12,523 per year.
4. Gradient series
A cash flow that increases by a constant G each period converts to an equivalent uniform annual amount.
Uniform gradient
Given: payments of 0, 100, 200, 300 at the ends of years 1–4, at 10%.
Solution: A = 100[1/0.10 − 4/(1.1⁴ − 1)] = 100(10 − 8.619) = $138.1 per year.
5. Nominal and effective rates
A nominal rate r compounded m times a year has an effective annual rate of:
12% nominal compounded monthly is (1.01)¹² − 1 = 12.68% effective. Always match the interest period to the cash-flow period.
6. Comparing alternatives
| Method | Rule |
|---|---|
| Present worth (PW) | choose the highest PW (or lowest PW of costs) |
| Annual worth (AW) | convert everything to a uniform annual amount |
| Rate of return (IRR) | rate where PW = 0; accept if above the MARR |
| Benefit–cost (B/C) | accept if B/C > 1; compare alternatives incrementally |
| Payback | years to recover cost; ignores time value and later cash flows |
Alternatives with unequal lives must be compared over the same period: use a common multiple of the lives, or compare annual worths directly (valid if the alternatives repeat).
Annual worth comparison
Given: Machine A costs $10,000 with $1,000 annual cost. Machine B costs $15,000 with $500 annual cost. Both last 5 years, i = 8%.
Solution: (A/P, 8%, 5) = 0.25046. AW(A) = 10,000(0.25046) + 1,000 = $3,505. AW(B) = 15,000(0.25046) + 500 = $4,257.
Answer: choose A, since its equivalent annual cost is lower.
Rate of return
Given: invest $1,000 now and receive $1,210 in 2 years.
Solution: 1,000(1 + i)² = 1,210 → (1 + i)² = 1.21 → i = 10%.
7. Depreciation
- Straight line: D = (Cost − Salvage)/Life. Book value falls by D every year.
- Declining balance: depreciate a fixed percentage of the beginning book value. Double declining uses 2/N.
- MACRS (tax depreciation) uses tabulated percentages by property class; do not depreciate below salvage in book methods.
Double-declining balance
Given: $10,000 asset, 5-year life (rate 2/5 = 40%).
Solution: year 1: 0.40 × 10,000 = $4,000. Year 2: 0.40 × (10,000 − 4,000) = $2,400.
8. Inflation and break-even
The real (inflation-free) rate is i′ = (1 + i)/(1 + f) − 1. Break-even analysis finds the quantity where total revenue equals total cost: Q = Fixed cost/(Price − Variable cost).
Common mistakes
- Using an annual factor with monthly cash flows (or the reverse).
- Treating the first annuity payment as occurring at time zero.
- Choosing the alternative with the smaller first cost without comparing equal time periods.
- Using a nominal rate directly as if it were effective.
- Depreciating below salvage value.
Exam strategy
Write a cash-flow diagram, identify the known and unknown (P, F, A), and pick the single factor that links them. Check the answer for reasonableness: future values must exceed present values at positive rates.
Checklist
- [ ] I can pick the correct factor for P, F and A problems.
- [ ] I can convert nominal rates to effective rates.
- [ ] I can compare alternatives by PW, AW and rate of return.
- [ ] I can handle gradients and unequal lives.
- [ ] I can compute straight-line and declining-balance depreciation.
Formula summary
- Future worth
- F = P(1 + i)ⁿ
- Capital recovery
- A = P · i(1+i)ⁿ / [(1+i)ⁿ − 1]
- Annuity PW
- P = A · [(1+i)ⁿ − 1] / [i(1+i)ⁿ]
- Effective rate
- i_eff = (1 + r/m)ᵐ − 1
- Straight-line depreciation
- D = (C − S)/N
Worked problems
1. $10,000 is invested at 6% compounded annually. Its value after 5 years is closest to:
- $13,000
- $13,382
- $14,185
- $12,000
Answer: B. F = 10,000(1.06)⁵ = 10,000(1.3382) = $13,382. ($13,000 is simple interest.)
2. A $50,000 loan at 8% is repaid in 5 equal annual payments. The payment is closest to:
- $10,000
- $11,000
- $12,523
- $14,200
Answer: C. A = 50,000 × 0.08(1.08)⁵ / [(1.08)⁵ − 1] = 50,000 × 0.25046 = $12,523.
3. The present worth of $2,000 per year for 10 years at 5% is closest to:
- $15,443
- $20,000
- $12,000
- $16,289
Answer: A. P = 2,000 × [(1.05)¹⁰ − 1]/[0.05(1.05)¹⁰] = 2,000 × 7.7217 = $15,443.
4. A nominal rate of 12% compounded monthly has an effective annual rate of:
- 12.00%
- 12.55%
- 12.68%
- 13.00%
Answer: C. (1 + 0.12/12)¹² − 1 = 1.01¹² − 1 = 0.1268 = 12.68%.
5. Equipment costs $50,000, has a $5,000 salvage value and a 9-year life. Using straight-line depreciation, the book value after 4 years is:
- $25,000
- $27,500
- $30,000
- $32,000
Answer: C. D = (50,000 − 5,000)/9 = 5,000 per year. Book value = 50,000 − 4(5,000) = $30,000.
6. A project has benefits with a present worth of $450,000 and costs with a present worth of $360,000. The B/C ratio and decision are:
- 0.80, reject
- 1.25, accept
- 1.25, reject
- 0.80, accept
Answer: B. B/C = 450/360 = 1.25 > 1, so the project is economically justified.
7. An investment of $10,000 returns $4,000 per year for 3 years at i = 10%. The net present worth is closest to:
- −$2,000
- −$53
- +$53
- +$2,000
Answer: B. PW = 4,000(P/A, 10%, 3) = 4,000(2.4869) = $9,947. NPW = 9,947 − 10,000 = −$53.
8. To accumulate $100,000 in 5 years at 8%, equal year-end deposits (sinking fund) must be closest to:
- $14,693
- $17,046
- $20,000
- $22,000
Answer: B. A = F · i/[(1 + i)ⁿ − 1] = 100,000(0.08)/0.4693 = $17,046.
9. A $60,000 machine saves $15,000 per year. The simple payback period is:
- 2.5 years
- 4 years
- 6 years
- 15 years
Answer: B. 60,000/15,000 = 4 years.
10. The market interest rate is 10% and inflation is 3%. The real interest rate is closest to:
- 3.0%
- 6.8%
- 7.0%
- 13.3%
Answer: B. i′ = (1.10/1.03) − 1 = 6.8%.
11. An asset costs $10,000 with a 5-year life. Using double-declining-balance depreciation (40% rate), year-2 depreciation is:
- $1,600
- $2,000
- $2,400
- $4,000
Answer: C. Year 1: 0.4(10,000) = 4,000. Year 2: 0.4(10,000 − 4,000) = $2,400.
12. A $20,000 machine with no salvage value and a 5-year life at 10% has an equivalent annual cost closest to:
- $3,000
- $4,000
- $5,276
- $6,000
Answer: C. A = 20,000(A/P, 10%, 5) = 20,000(0.2638) = $5,276.
Chapter 14 · ~7–10%
Statics
Overview
Statics is the study of bodies at rest. Every problem relies on the same idea: the forces and moments on a body in equilibrium sum to zero. The skill is drawing a correct free-body diagram and then choosing the equations that solve for the fewest unknowns first.
1. Forces, vectors and moments
A force has magnitude, direction and line of action. Resolve it into components.
A moment about a point is force times the perpendicular distance, M = F·d, positive counter-clockwise by convention. A couple is two equal and opposite forces; its moment is the same about every point.
Resultant of two forces
Given: 100 N along +x and 100 N along +y.
Solution: R = √(100² + 100²) = 141.4 N at 45° above the x-axis.
2. Equilibrium
For a body in a plane:
In three dimensions there are six equations (three forces, three moments). A two-force member carries load only along its axis. A three-force member has concurrent forces.
3. Free-body diagrams and supports
Isolate the body and show every external force and reaction. Replace each support with the reactions it provides.
| Support | Reactions |
|---|---|
| Roller or rocker | one force, perpendicular to the surface |
| Pin | two force components |
| Fixed (cantilever) | two force components and a moment |
| Cable | one force, along the cable (tension) |
Take moments about the point where the most unknown forces intersect to isolate one unknown.
Beam reactions
Given: a 10 m simply supported beam carries 4 kN/m over the left 6 m and a 20 kN point load 8 m from A.
Solution: the distributed load is equivalent to 24 kN at 3 m. Moments about A: R_B(10) = 24(3) + 20(8) = 232, so R_B = 23.2 kN. Then R_A = 44 − 23.2 = 20.8 kN.
4. Distributed loads
Replace a distributed load by its resultant: the area under the load diagram, acting at the centroid of that area. A uniform load w over length L gives wL at L/2; a triangular load with peak w gives wL/2 at L/3 from the large end.
5. Trusses
A truss is built from two-force members joined at pins. It is statically determinate if m + r = 2j (members plus reactions equal twice the joints).
- Method of joints: apply ΣFx = 0 and ΣFy = 0 at each pin, starting at a joint with at most two unknowns. Assume tension (force pulling away from the joint); a negative answer means compression.
- Method of sections: cut through at most three members and take moments about the intersection of two of them.
- Zero-force members: at an unloaded joint where two non-collinear members meet, both are zero-force; at an unloaded three-member joint with two collinear, the third is zero-force.
6. Friction
Static friction opposes impending motion and is at most μₛN. Check whether the friction needed for equilibrium is less than μₛN before assuming the body slips.
Block on an incline
Given: a 500 N block on a 20° incline, μₛ = 0.3. Find the force parallel to the incline needed to start it moving up.
Solution: P = W sin θ + μₛ W cos θ = 500(0.3420) + 0.3(500)(0.9397) = 171.0 + 141.0 = 312 N.
On an incline the block just slides when tan θ = μₛ, so the minimum friction coefficient to hold it is tan θ.
7. Centroids and moments of inertia
Break a composite shape into simple parts (rectangles, triangles, circles), measure each centroid from a common reference, and take the area-weighted average. Subtract holes as negative areas.
Composite centroid
Given: a T-section with a 200 × 40 mm flange on top of a 40 × 160 mm web. Find ȳ from the bottom.
Solution: web: A = 6,400 mm² at 80 mm. Flange: A = 8,000 mm² at 180 mm. ȳ = (6400 × 80 + 8000 × 180)/14,400 = 135.6 mm.
Moment of inertia of a rectangle about its centroid: I = bh³/12. To shift to another parallel axis use the parallel-axis theorem:
For b = 4 and h = 6, I_c = 72. About an axis 5 units away: I = 72 + 24(25) = 672.
Common mistakes
- Omitting a reaction or moment on the free-body diagram.
- Using the full length of a distributed load instead of its resultant.
- Taking moments about a point and forgetting a force that passes through the point (it contributes zero).
- Assuming friction is always μN even when the body is not about to slip.
- Measuring centroid distances from different reference lines.
Exam strategy
Draw the FBD first, count unknowns, choose a moment point that kills the most unknowns, and check that the signs make physical sense. For trusses, look for zero-force members before starting.
Checklist
- [ ] I can draw a correct free-body diagram and name each support's reactions.
- [ ] I can solve beam reactions with distributed and point loads.
- [ ] I can find truss member forces by joints and by sections.
- [ ] I can solve friction problems on flat surfaces and inclines.
- [ ] I can find composite centroids and use the parallel-axis theorem.
Formula summary
- Equilibrium
- ΣFx = 0, ΣFy = 0, ΣM = 0
- Moment
- M = F · d (perpendicular distance)
- Static friction
- F ≤ μₛ N
- Uniform load resultant
- R = wL at L/2
Worked problems
1. A 10 m simply supported beam carries a 20 kN point load 4 m from support A. The reaction at A is:
- 8 kN
- 10 kN
- 12 kN
- 20 kN
Answer: C. ΣM about B: R_A(10) = 20(6) → R_A = 12 kN, and R_B = 8 kN.
2. Forces of 100 N along +x and 100 N along +y act on a particle. The resultant is:
- 100 N at 45°
- 141.4 N at 45°
- 200 N at 45°
- 141.4 N at 0°
Answer: B. √(100² + 100²) = 141.4 N at arctan(100/100) = 45°.
3. A 50 kg block rests on a horizontal surface with μₛ = 0.4. The horizontal force needed to start it moving is closest to:
- 20 N
- 78 N
- 196 N
- 490 N
Answer: C. N = mg = 490.5 N. F = μₛN = 0.4 × 490.5 = 196 N.
4. A 200 N force acts perpendicular to a wrench 1.5 m from the bolt. The moment about the bolt is:
- 133 N·m
- 300 N·m
- 200 N·m
- 75 N·m
Answer: B. M = F·d = 200 × 1.5 = 300 N·m.
5. The centroid of a triangle of height h is located at what distance above its base?
- h/2
- h/4
- h/3
- 2h/3
Answer: C. The centroid of a triangle lies one-third of the height above the base.
6. A 10 kN vertical load hangs from a joint supported by two identical members each at 45° to the horizontal. The force in each member is:
- 5.00 kN
- 7.07 kN
- 10.0 kN
- 14.1 kN
Answer: B. ΣFy: 2F sin45° = 10 → F = 10/(2 × 0.7071) = 7.07 kN.
7. A simply supported beam spans 6 m and carries a uniform 5 kN/m load. The maximum moment is:
- 15.0 kN·m
- 22.5 kN·m
- 45.0 kN·m
- 30.0 kN·m
Answer: B. M_max = wL²/8 = 5(36)/8 = 22.5 kN·m at midspan.
8. Two equal and opposite 50 N forces act 0.4 m apart. The couple moment is:
- 0
- 20 N·m
- 40 N·m
- 100 N·m
Answer: B. M = F·d = 50 × 0.4 = 20 N·m.
9. A 100 N weight hangs from two symmetric cables, each 60° from the horizontal. The tension in each cable is closest to:
- 50 N
- 57.7 N
- 100 N
- 115 N
Answer: B. 2T sin60° = 100 → T = 100/(2 × 0.866) = 57.7 N.
10. A shape has two parts: A₁ = 20 with centroid ȳ₁ = 5 and A₂ = 10 with centroid ȳ₂ = 1. The composite centroid ȳ is:
- 3.00
- 3.67
- 4.00
- 6.00
Answer: B. ȳ = (20·5 + 10·1)/30 = 110/30 = 3.67.
11. A rectangle (b = 4, h = 6) has I_c = bh³/12 = 72 about its centroid. About an axis parallel and 5 units away, I is:
- 72
- 600
- 672
- 744
Answer: C. I = I_c + Ad² = 72 + 24(25) = 672.
12. A block rests on a 30° incline. The minimum static friction coefficient needed to keep it from sliding is:
- 0.25
- 0.50
- 0.577
- 0.866
Answer: C. μ ≥ tanθ = tan30° = 0.577.
13. A 4 m cantilever carries a uniform 2 kN/m. The moment at the fixed support is:
- 4 kN·m
- 8 kN·m
- 16 kN·m
- 32 kN·m
Answer: C. M = wL²/2 = 2(16)/2 = 16 kN·m.
Chapter 15 · ~6–9%
Dynamics
Overview
Dynamics adds motion to statics. Questions fall into kinematics (describing motion), kinetics (forces and accelerations), and energy and momentum methods. A good habit is choosing the principle that avoids the unknowns you do not need: energy links speed and position, impulse–momentum links force, time and velocity.
1. Particle kinematics
For constant acceleration along a line:
For non-constant acceleration, integrate or differentiate: v = ds/dt, a = dv/dt = v dv/ds.
Constant acceleration
Given: a car starts from rest and accelerates at 3 m/s² for 8 s.
Solution: v = 3(8) = 24 m/s and s = ½(3)(8²) = 96 m.
2. Projectile motion
The horizontal velocity is constant; the vertical motion has a = −g.
Maximum height
Given: launch speed 20 m/s at 30°.
Solution: vertical component 10 m/s. h = 10²/(2 × 9.81) = 5.10 m.
3. Newton's second law
Draw a free-body diagram, choose axes, and write one equation per direction. On an incline with friction:
Block sliding down an incline
Given: θ = 30°, kinetic friction μ = 0.2.
Solution: a = 9.81(0.5 − 0.2 × 0.866) = 9.81(0.3268) = 3.21 m/s².
For circular motion the normal (centripetal) acceleration points toward the center: aₙ = v²/r = ω²r.
4. Work, energy and power
If only conservative forces act, KE + PE is constant. Friction and other non-conservative forces remove mechanical energy.
Work-energy
Given: a 2 kg block moving at 3 m/s has 18 J of net work done on it.
Solution: KE₁ = ½(2)(9) = 9 J. KE₂ = 27 J = ½(2)v², so v = 5.20 m/s.
5. Impulse, momentum and impact
In a collision momentum is conserved. Energy is conserved only in a perfectly elastic collision. The coefficient of restitution relates relative speeds:
Bouncing ball
Given: a ball dropped from 2 m bounces back to 1.28 m.
Solution: speeds are proportional to √h, so e = √(1.28/2) = √0.64 = 0.8.
A perfectly plastic collision (e = 0) leaves the bodies moving together. A 2 kg mass at 4 m/s hitting a stationary 2 kg mass gives 2(4) = 4v, so v = 2 m/s.
6. Rigid-body rotation
For rotation about a fixed axis, ω = dθ/dt, α = dω/dt and the equations mirror the straight-line ones with θ, ω, α in place of s, v, a. A point at radius r moves with v = ωr, tangential acceleration aₜ = αr and normal acceleration ω²r.
| Body (about its center / axis) | I |
|---|---|
| Solid disk or cylinder | ½ m r² |
| Thin ring | m r² |
| Slender rod (center) | m L²/12 |
| Solid sphere | (2/5) m r² |
Rotational acceleration
Given: a 10 kg solid disk of radius 0.5 m is driven by a torque of 5 N·m.
Solution: I = ½(10)(0.25) = 1.25 kg·m². α = M/I = 5/1.25 = 4 rad/s².
7. Vibrations
A mass m on a spring k has natural frequency ωₙ = √(k/m) rad/s, period T = 2π/ωₙ. A simple pendulum has T = 2π√(L/g). With viscous damping c, the damping ratio is:
ζ < 1 is underdamped (oscillates and decays), ζ = 1 is critically damped, ζ > 1 is overdamped.
Damping ratio
Given: m = 10 kg, k = 1000 N/m, c = 40 N·s/m.
Solution: √(km) = √10,000 = 100, so ζ = 40/200 = 0.20 (underdamped).
Common mistakes
- Using constant-acceleration equations when acceleration varies.
- Forgetting that energy is lost in inelastic collisions.
- Mixing degrees with radians for ω.
- Using the mass instead of the moment of inertia in rotational problems.
- Taking friction in the wrong direction on an incline.
Exam strategy
Ask what is given and what is wanted. If time is not involved, use energy. If the force acts over a time and the problem asks for velocity change, use impulse. If a collision is mentioned, start with conservation of momentum.
Checklist
- [ ] I can use the constant-acceleration equations and projectile formulas.
- [ ] I can apply Newton's second law on flat and inclined surfaces.
- [ ] I can use work–energy and impulse–momentum.
- [ ] I can handle impacts with the coefficient of restitution.
- [ ] I can solve rotation and spring-mass vibration problems.
Formula summary
- Kinematics
- s = v₀t + ½at²
- Work–energy
- W = ½m(v₂² − v₁²)
- Normal acceleration
- aₙ = ω²r = v²/r
- Natural frequency
- ωₙ = √(k/m)
- Impulse–momentum
- FΔt = mΔv
Worked problems
1. A car starts from rest and accelerates at 3 m/s² for 8 s. The distance covered is:
- 24 m
- 48 m
- 96 m
- 192 m
Answer: C. s = ½at² = ½(3)(64) = 96 m.
2. A projectile is launched at 20 m/s at 30° above horizontal. The maximum height is closest to:
- 2.55 m
- 5.10 m
- 10.2 m
- 20.4 m
Answer: B. v_y = 20 sin30° = 10 m/s. h = v_y²/2g = 100/19.62 = 5.10 m.
3. A 2 kg object moving at 3 m/s has 18 J of work done on it. Its new speed is closest to:
- 3.00 m/s
- 4.24 m/s
- 5.20 m/s
- 6.00 m/s
Answer: C. KE₁ = ½(2)(9) = 9 J. KE₂ = 27 J = (1)v² → v = 5.20 m/s.
4. A particle moves on a circle of radius 2 m with constant ω = 3 rad/s. Its normal acceleration is:
- 6 m/s²
- 9 m/s²
- 18 m/s²
- 36 m/s²
Answer: C. aₙ = ω²r = 9 × 2 = 18 m/s².
5. A 0.5 kg ball changes velocity from +10 m/s to −6 m/s on impact. The magnitude of the impulse is:
- 2 N·s
- 4 N·s
- 8 N·s
- 16 N·s
Answer: C. J = mΔv = 0.5 × 16 = 8 N·s.
6. A 2 kg mass is attached to a 200 N/m spring. The natural circular frequency is:
- 5 rad/s
- 10 rad/s
- 14.1 rad/s
- 100 rad/s
Answer: B. ωₙ = √(k/m) = √(200/2) = 10 rad/s (f ≈ 1.59 Hz).
7. A 10 kg object is acted on by a net force of 50 N. Its acceleration is:
- 0.2 m/s²
- 5 m/s²
- 50 m/s²
- 500 m/s²
Answer: B. a = F/m = 50/10 = 5 m/s².
8. A stone is dropped from rest through 20 m. Ignoring drag, the impact speed is closest to:
- 9.9 m/s
- 14.0 m/s
- 19.8 m/s
- 39.2 m/s
Answer: C. v = √(2gh) = √(2 × 9.81 × 20) = 19.8 m/s.
9. A car at 20 m/s brakes with μ = 0.7 on level road. The stopping distance is closest to:
- 14.6 m
- 29.1 m
- 40.8 m
- 58.2 m
Answer: B. a = μg = 6.87 m/s². d = v²/2a = 400/13.73 = 29.1 m.
10. A wheel starts from rest with α = 2 rad/s². After 5 s the angle turned is:
- 10 rad
- 12.5 rad
- 25 rad
- 50 rad
Answer: C. θ = ½αt² = ½(2)(25) = 25 rad.
11. A 2 kg mass at 4 m/s strikes a stationary 2 kg mass and they stick together. The final speed is:
- 1 m/s
- 2 m/s
- 4 m/s
- 8 m/s
Answer: B. Momentum: 2(4) = 4v → v = 2 m/s.
12. A motor lifts a 100 kg load 5 m in 10 s. The average power is closest to:
- 50 W
- 490 W
- 981 W
- 4,905 W
Answer: B. P = mgh/t = 100(9.81)(5)/10 = 490 W.
13. The period of a simple pendulum of length 1 m (small angles) is closest to:
- 1.0 s
- 2.0 s
- 3.14 s
- 6.28 s
Answer: B. T = 2π√(L/g) = 2π√(1/9.81) = 2.01 s.
Chapter 16 · ~7–10%
Mechanics of Materials
Overview
Mechanics of materials connects the loads on a member to the stresses, strains and deflections inside it. The five load types are axial, torsion, bending, shear and pressure. For each, there is a stress formula and a deformation formula, and the same handful of ideas repeats. Keep units consistent: newtons with millimetres gives megapascals.
1. Stress and strain
Poisson's ratio ν = −(lateral strain)/(axial strain). The factor of safety is the ratio of failure stress to allowable stress.
2. Axial loading
Elongation under a constant axial force:
For several segments add the elongations, using the internal force in each segment. For temperature change a restrained bar develops stress:
Axial elongation
Given: an aluminum bar (E = 70 GPa) of area 250 mm² and length 1.5 m carries 50 kN in tension.
Solution: δ = (50,000 N)(1500 mm)/[(250 mm²)(70,000 MPa)] = 4.29 mm.
3. Torsion of circular shafts
Power transmitted: P = T ω, with ω = 2πN/60 for N in rpm.
Shaft in torsion
Given: a solid 40 mm steel shaft (G = 80 GPa) carries T = 500 N·m over 1 m.
Solution: τ = 16(500,000 N·mm)/[π(40)³] = 39.8 MPa. J = π(40)⁴/32 = 251,300 mm⁴, so φ = (500,000)(1000)/[(80,000)(251,300)] = 0.0249 rad = 1.43°.
4. Bending of beams
For a rectangle I = bh³/12 and c = h/2. The stress is zero at the neutral axis and largest at the extreme fibres. Shear in a beam varies with depth:
Bending stress
Given: a 50 mm × 150 mm rectangular beam (150 mm deep) carries M = 5 kN·m.
Solution: I = 50(150)³/12 = 14.06×10⁶ mm⁴. σ = (5×10⁶ N·mm)(75 mm)/(14.06×10⁶ mm⁴) = 26.7 MPa.
Common deflection formulas (constant EI):
| Case | Maximum deflection |
|---|---|
| Simple beam, central point load | PL³/(48EI) |
| Simple beam, uniform load | 5wL⁴/(384EI) |
| Cantilever, end load | PL³/(3EI) |
| Cantilever, uniform load | wL⁴/(8EI) |
5. Combined and transformed stresses
Axial plus bending gives σ = P/A ± Mc/I. At a point with stresses σx, σy and τxy the principal stresses and maximum in-plane shear are:
Mohr's circle
Given: σx = 60 MPa, σy = −20 MPa, τxy = 30 MPa.
Solution: center = (60 − 20)/2 = 20 MPa. R = √(40² + 30²) = 50 MPa.
Answer: σ₁ = 70 MPa, σ₂ = −30 MPa, τ_max = 50 MPa.
6. Thin-walled pressure vessels
For a cylinder of internal pressure p, radius r and thickness t (t ≪ r): hoop stress σ_h = pr/t and longitudinal stress σ_L = pr/(2t). A sphere has σ = pr/(2t). The hoop stress is twice the longitudinal stress, so a cylinder splits along its length first.
7. Column buckling
The effective-length factor K is 1.0 for pinned–pinned, 0.5 for fixed–fixed, 0.7 for fixed–pinned and 2.0 for fixed–free. The column buckles about the axis with the smaller I.
Euler buckling
Given: a pinned–pinned steel column, E = 200 GPa, I = 8×10⁻⁶ m⁴, L = 4 m.
Solution: P_cr = π²(200×10⁹)(8×10⁻⁶)/16 = 987 kN.
Common mistakes
- Mixing units (metres with millimetres, or MPa with GPa).
- Using the full cross-section area for axial stress when the section has a hole.
- Taking c as the full depth instead of the distance to the extreme fibre.
- Forgetting that Euler's formula applies only to slender columns.
- Applying the hoop-stress formula to the longitudinal direction.
Exam strategy
Write the unit system at the top of the page. Identify the load type, pick the matching stress formula, and check that the answer is physically reasonable (steel yields near 250 MPa). For Mohr's circle, find the center and radius first.
Checklist
- [ ] I can calculate axial stress, strain and elongation.
- [ ] I can find torsion stress and angle of twist.
- [ ] I can find bending and shear stresses in a beam.
- [ ] I can find principal stresses with Mohr's circle.
- [ ] I can compute the Euler buckling load for different end conditions.
Formula summary
- Axial stress / elongation
- σ = P/A, δ = PL/(AE)
- Flexure
- σ = Mc/I, I(rect) = bh³/12
- Torsion (solid)
- τ = 16T/(πd³)
- Euler buckling
- P_cr = π²EI/(KL)²
- Max in-plane shear
- τ_max = √[((σx−σy)/2)² + τxy²]
Worked problems
1. A 20 kN axial load acts on a bar with a cross-sectional area of 100 mm². The normal stress is:
- 20 MPa
- 100 MPa
- 200 MPa
- 2000 MPa
Answer: C. σ = P/A = 20,000 N / 100 mm² = 200 MPa.
2. A steel bar (E = 200 GPa), A = 200 mm², L = 2 m carries 10 kN in tension. The elongation is:
- 0.25 mm
- 0.50 mm
- 1.00 mm
- 5.0 mm
Answer: B. δ = PL/AE = (10,000)(2000)/(200)(200,000) = 0.50 mm.
3. A 100 mm × 200 mm rectangular beam (200 mm deep) carries a moment of 10 kN·m. The maximum bending stress is:
- 7.5 MPa
- 10 MPa
- 15 MPa
- 30 MPa
Answer: C. I = 100(200)³/12 = 66.67×10⁶ mm⁴, c = 100 mm. σ = (10×10⁶)(100)/66.67×10⁶ = 15 MPa.
4. A solid 50 mm diameter shaft transmits a 1 kN·m torque. The maximum shear stress is closest to:
- 20.4 MPa
- 40.7 MPa
- 81.5 MPa
- 163 MPa
Answer: B. τ = 16T/(πd³) = 16(10⁶)/(π × 125,000) = 40.7 MPa.
5. A pinned–pinned column has E = 200 GPa, I = 2×10⁻⁶ m⁴, L = 3 m. The Euler buckling load is closest to:
- 44 kN
- 219 kN
- 439 kN
- 1,316 kN
Answer: C. P_cr = π²EI/L² = 9.870(200×10⁹)(2×10⁻⁶)/9 = 439 kN.
6. A bar has axial strain 0.001 and Poisson’s ratio 0.3. The lateral strain is:
- +0.0003
- −0.0003
- −0.0010
- −0.0033
Answer: B. ε_lateral = −νε_axial = −0.3(0.001) = −0.0003.
7. At a point, σx = 80 MPa, σy = 20 MPa and τxy = 0. The maximum in-plane shear stress is:
- 15 MPa
- 30 MPa
- 50 MPa
- 60 MPa
Answer: B. τ_max = (σx − σy)/2 = 30 MPa.
8. A fully restrained steel bar (E = 200 GPa, α = 12×10⁻⁶/°C) is heated 50 °C. The thermal stress is:
- 12 MPa
- 60 MPa
- 120 MPa
- 240 MPa
Answer: C. σ = EαΔT = 200,000(12×10⁻⁶)(50) = 120 MPa.
9. A thin-walled cylinder (r = 500 mm, t = 10 mm) holds 2 MPa. The hoop stress is:
- 10 MPa
- 50 MPa
- 100 MPa
- 200 MPa
Answer: C. σ_h = pr/t = 2(500)/10 = 100 MPa (longitudinal = 50 MPa).
10. A 100 × 200 mm rectangular beam carries a shear V = 30 kN. The maximum shear stress (1.5V/A) is:
- 1.0 MPa
- 1.5 MPa
- 2.25 MPa
- 3.0 MPa
Answer: C. τ_max = 1.5(30,000)/20,000 = 2.25 MPa.
11. A 10 mm diameter bolt carries 20 kN in single shear. The shear stress is closest to:
- 64 MPa
- 127 MPa
- 255 MPa
- 510 MPa
Answer: C. A = π(10)²/4 = 78.5 mm². τ = 20,000/78.5 = 255 MPa.
12. At a point σx = 100 MPa, σy = 0 and τxy = 50 MPa. The maximum principal stress is closest to:
- 70.7 MPa
- 100 MPa
- 121 MPa
- 150 MPa
Answer: C. σ₁ = 50 + √(50² + 50²) = 50 + 70.7 = 120.7 MPa.
13. For the same length, a column fixed at the base and free at the top buckles at what fraction of the pinned–pinned Euler load?
- 1/4
- 1/2
- 2
- 4
Answer: A. K = 2 for fixed–free, so P_cr ∝ 1/(KL)² = 1/4 of the pinned–pinned value.
Chapter 17 · ~6–9%
Fluid Mechanics
Overview
Fluid mechanics questions cover pressure and hydrostatics, flow rate and energy in pipes, forces from moving fluid, and drag. Most are one-step calculations once you recognise whether the fluid is at rest, flowing in a pipe, or hitting something.
1. Fluid properties
Viscosity μ (dynamic) resists shear; kinematic viscosity ν = μ/ρ. For a Newtonian fluid, τ = μ (du/dy). Surface tension and vapor pressure matter for capillary rise and cavitation.
2. Hydrostatics
Pressure grows linearly with depth and is the same in every direction at a point.
Gauge pressure is relative to atmosphere (101.3 kPa); absolute = gauge + atmospheric. In a manometer, move through the fluids adding ρgh when going down and subtracting when going up.
Manometer
Given: a mercury manometer (SG = 13.6) shows a height difference of 0.20 m.
Solution: ΔP = SG·ρ_w·g·h = 13.6(1000)(9.81)(0.20) = 26.7 kPa.
Force on a submerged plane surface: F = ρ g h_c A, where h_c is the depth of the centroid. It acts below the centroid at the center of pressure.
Force on a gate
Given: a vertical rectangular gate 2 m wide and 3 m tall has its top edge at the water surface.
Solution: h_c = 1.5 m, A = 6 m². F = 1000(9.81)(1.5)(6) = 88.3 kN.
Buoyancy: the upward force equals the weight of fluid displaced, F_B = ρ_fluid g V_displaced. A floating body displaces its own weight.
3. Continuity and flow rate
For incompressible steady flow:
Halving a pipe diameter multiplies the velocity by four, because area scales with the square of the diameter.
4. The energy (Bernoulli) equation
Along a streamline of steady, incompressible, frictionless flow:
Add head terms for a pump (h_p) and subtract head losses (h_L) for real systems. Torricelli's result for a tank outlet at depth h is v = √(2gh).
Pressure change in a contraction
Given: water flows at 2 m/s through a 0.2 m pipe that narrows to 0.1 m (horizontal).
Solution: continuity gives v₂ = 2(4) = 8 m/s. Bernoulli: P₁ − P₂ = ½ρ(v₂² − v₁²) = ½(1000)(64 − 4) = 30 kPa.
5. Pipe flow and losses
For laminar flow f = 64/Re. For turbulent flow read f from the Moody diagram using Re and the relative roughness ε/D. Minor losses at fittings are h_m = K v²/2g.
Head loss
Given: f = 0.02, L = 100 m, D = 0.1 m, v = 2 m/s.
Solution: h_f = 0.02(100/0.1)(2²/19.62) = 0.02(1000)(0.2039) = 4.08 m.
Pump power: ideal hydraulic power is P = ρ g Q H; divide by efficiency for shaft power.
6. Momentum and forces from jets
The force required to change fluid momentum is F = ρ Q (v_out − v_in) in the flow direction.
Jet striking a plate
Given: a water jet of area 0.0005 m² moves at 20 m/s and stops against a flat plate.
Solution: Q = 0.0005(20) = 0.01 m³/s. F = ρ Q v = 1000(0.01)(20) = 200 N.
7. Drag and dimensional analysis
A Pitot tube measures velocity from dynamic pressure, v = √(2Δp/ρ). Useful dimensionless numbers: Reynolds (inertia/viscous), Froude v/√(gL) (inertia/gravity) and Mach (speed/speed of sound).
Common mistakes
- Using gauge pressure where absolute is needed (gas laws).
- Using the wrong depth: the centroid depth for force, not the bottom depth.
- Forgetting that velocity changes when the diameter changes.
- Mixing mass density and specific weight.
- Using the Darcy friction factor with the wrong Reynolds regime.
Exam strategy
Classify the problem first (static, pipe flow, jet force, drag). Write the governing equation, keep units in SI, and check the answer's order of magnitude (water pressure rises 9.81 kPa per metre of depth).
Checklist
- [ ] I can compute pressure with depth and read a manometer.
- [ ] I can find the hydrostatic force on a plane surface and the buoyant force.
- [ ] I can apply continuity and Bernoulli.
- [ ] I can find head loss and pump power.
- [ ] I can find jet forces and drag.
Formula summary
- Hydrostatic pressure
- P = ρ g h
- Continuity
- Q = A v
- Bernoulli
- P/γ + v²/2g + z = const
- Reynolds number
- Re = ρ v D / μ
- Darcy–Weisbach
- h_f = f (L/D) (v²/2g)
- Buoyancy
- F_B = ρ g V
Worked problems
1. The gauge pressure at a depth of 10 m in fresh water is closest to:
- 9.81 kPa
- 49.1 kPa
- 98.1 kPa
- 981 kPa
Answer: C. P = ρgh = 1000(9.81)(10) = 98.1 kPa.
2. Water flows at 2 m/s in a 0.2 m diameter pipe that reduces to 0.1 m diameter. The velocity in the smaller section is:
- 4 m/s
- 8 m/s
- 16 m/s
- 1 m/s
Answer: B. Area ratio = (0.2/0.1)² = 4, so v₂ = 4 × 2 = 8 m/s.
3. Water drains from an orifice 5 m below the surface of a large tank. The exit velocity is closest to:
- 5.0 m/s
- 7.0 m/s
- 9.9 m/s
- 49 m/s
Answer: C. v = √(2gh) = √(2 × 9.81 × 5) = 9.9 m/s.
4. Water (ρ = 1000 kg/m³, μ = 0.001 Pa·s) flows at 1 m/s in a 0.05 m pipe. The flow is:
- Laminar, Re ≈ 50
- Laminar, Re ≈ 2,000
- Turbulent, Re ≈ 50,000
- Turbulent, Re ≈ 500,000
Answer: C. Re = ρvD/μ = 1000(1)(0.05)/0.001 = 50,000, which is turbulent.
5. Water flows at 3 m/s through a 0.1 m diameter pipe. The flow rate is closest to:
- 2.4 L/s
- 9.4 L/s
- 23.6 L/s
- 94 L/s
Answer: C. A = π(0.1)²/4 = 0.007854 m². Q = 0.007854(3) = 0.02356 m³/s = 23.6 L/s.
6. A fully submerged object has a volume of 0.002 m³ in water. The buoyant force is:
- 2.0 N
- 9.81 N
- 19.6 N
- 196 N
Answer: C. F_B = 1000(9.81)(0.002) = 19.6 N.
7. A pipe has f = 0.02, L = 100 m, D = 0.1 m and v = 2 m/s. The head loss is closest to:
- 0.41 m
- 2.04 m
- 4.08 m
- 40.8 m
Answer: C. h_f = 0.02(100/0.1)(4/19.62) = 0.02(1000)(0.2039) = 4.08 m.
8. A mercury manometer (SG 13.6) shows a difference of 0.2 m. The pressure difference is closest to:
- 2.0 kPa
- 19.6 kPa
- 26.7 kPa
- 133 kPa
Answer: C. ΔP = SG·ρ_w·g·h = 13.6(9,810)(0.2) = 26.7 kPa.
9. A vertical rectangular gate 2 m wide and 3 m tall has its top at the water surface. The hydrostatic force is closest to:
- 29.4 kN
- 58.9 kN
- 88.3 kN
- 176.6 kN
Answer: C. F = ρg h_c A = 9,810(1.5)(6) = 88.3 kN.
10. The ideal hydraulic power to pump 0.02 m³/s of water through 15 m of head is closest to:
- 0.29 kW
- 2.94 kW
- 14.7 kW
- 29.4 kW
Answer: B. P = ρgQH = 1,000(9.81)(0.02)(15) = 2,943 W.
11. Air (ρ = 1.2 kg/m³) at 20 m/s hits a flat plate of A = 2 m² with C_D = 1.0. The drag force is:
- 48 N
- 240 N
- 480 N
- 960 N
Answer: C. F = ½ρC_DAv² = 0.5(1.2)(1.0)(2)(400) = 480 N.
12. A Pitot tube in air (ρ = 1.2 kg/m³) reads a dynamic pressure of 500 Pa. The velocity is closest to:
- 14.4 m/s
- 20.4 m/s
- 28.9 m/s
- 41.7 m/s
Answer: C. v = √(2Δp/ρ) = √(2 × 500/1.2) = 28.9 m/s.
13. For laminar pipe flow at Re = 1,600, the Darcy friction factor f = 64/Re is:
- 0.016
- 0.02
- 0.04
- 0.08
Answer: C. f = 64/1,600 = 0.04.
Chapter 18 · ~4–7%
Materials Science
Overview
Materials questions are mostly definitions, comparisons and a few short calculations. This guide groups the ideas the way the exam does: structure, mechanical behaviour, phase diagrams, heat treatment, corrosion and the main material families.
1. Atomic structure and crystals
| Structure | Atoms per cell | Coordination | Packing factor |
|---|---|---|---|
| Simple cubic | 1 | 6 | 0.52 |
| BCC | 2 | 8 | 0.68 |
| FCC | 4 | 12 | 0.74 |
| HCP | 6 | 12 | 0.74 |
Iron is BCC at room temperature (ferrite) and FCC at high temperature (austenite). FCC metals such as copper and aluminum are generally more ductile. Defects (vacancies, dislocations, grain boundaries) control strength: more obstacles to dislocation motion means a stronger but less ductile metal.
2. Mechanical properties
A tensile test gives the stress–strain curve.
- Modulus of elasticity E: slope of the linear region (stiffness).
- Yield strength: stress at the onset of permanent deformation; use the 0.2% offset method if there is no clear yield point.
- Ultimate tensile strength: the peak of the engineering curve.
- Ductility: percent elongation or percent reduction in area.
- Toughness: energy absorbed to fracture, the area under the stress–strain curve; resilience is the area up to yield.
Hardness tests (Brinell, Rockwell, Vickers) measure resistance to indentation and correlate with tensile strength. The Charpy impact test measures toughness and reveals the ductile-to-brittle transition of steels at low temperature.
Stress concentrations at holes and notches raise the local stress: σ_max = K_t σ_nominal.
3. Fatigue, creep and fracture
- Fatigue: failure under repeated loading at stresses below yield. Steels have an endurance limit below which life is effectively infinite; aluminum does not.
- Creep: slow, time-dependent strain under constant load, serious at temperatures above about 0.4 of the melting temperature.
- Brittle fracture occurs with little plastic deformation, driven by flaws; fracture toughness K_Ic measures resistance.
4. Phase diagrams
A phase diagram shows which phases are stable at each temperature and composition. For a tie line across a two-phase region, the lever rule gives phase fractions.
Lever rule
Given: an alloy of 30 wt% B lies in a two-phase region where the α phase is 10 wt% B and the β phase is 60 wt% B.
Solution: W_β = (30 − 10)/(60 − 10) = 0.40 and W_α = 0.60.
The iron–carbon diagram has a eutectoid at 0.77 wt% C and 727 °C, where austenite transforms into pearlite (alternating ferrite and cementite). Steel has up to about 2.1 wt% C; cast iron has more. Hypoeutectoid steels (below 0.77% C) contain proeutectoid ferrite plus pearlite.
5. Heat treatment of steel
| Treatment | Result |
|---|---|
| Annealing | slow cool; soft, ductile, stress-free |
| Normalizing | air cool; finer grains, moderate strength |
| Quenching | fast cool; hard, brittle martensite |
| Tempering | reheat after quenching; trades hardness for toughness |
Hardenability is how deeply a steel can be hardened; alloying elements increase it. Cold working increases strength and reduces ductility (strain hardening); annealing restores ductility by recrystallization.
6. Corrosion
Corrosion is an electrochemical process. Oxidation occurs at the anode (metal loss) and reduction at the cathode. In a galvanic cell the more active metal in the galvanic series becomes the anode and corrodes faster. Protection methods: coatings, galvanizing (a sacrificial zinc anode), cathodic protection, inhibitors, and choosing compatible metals. Other types include pitting, crevice, stress-corrosion cracking and intergranular attack.
7. Polymers, ceramics and composites
- Thermoplastics soften when heated and can be reshaped. Thermosets are cross-linked and decompose rather than melt. Elastomers are lightly cross-linked and very stretchy.
- Ceramics are hard, strong in compression, brittle and resist heat and corrosion.
- Composites combine materials. For fibres aligned with the load, the upper-bound modulus follows the rule of mixtures:
Rule of mixtures
Given: 60% fibre by volume (E = 200 GPa) in a matrix with E = 3 GPa.
Solution: E_c = 0.6(200) + 0.4(3) = 121.2 GPa along the fibres.
Common mistakes
- Confusing strength (stress to fail) with stiffness (modulus).
- Mixing up toughness (area under the whole curve) with hardness (resistance to indentation).
- Treating the iron–carbon eutectoid composition as 4.3% (that is the eutectic).
- Forgetting that the more active metal is the one that corrodes in a galvanic couple.
Exam strategy
Many questions can be answered by definition alone. Learn the vocabulary, memorize the three numbers (0.77% C, 727 °C, 4.3% C), and use the lever rule only after identifying the tie-line endpoints correctly.
Checklist
- [ ] I know the atoms per cell, coordination and packing factors for FCC, BCC and HCP.
- [ ] I can read a stress–strain curve and define yield, UTS, ductility and toughness.
- [ ] I can apply the lever rule and describe the iron–carbon eutectoid.
- [ ] I can match heat treatments to their results.
- [ ] I can explain galvanic corrosion and common protection methods.
Formula summary
- FCC / BCC APF
- FCC 0.74, BCC 0.68
- Eutectoid (Fe–C)
- 0.77 wt% C at 727 °C
- Hooke
- σ = Eε
- Engineering strain
- ε = ΔL/L₀
Worked problems
1. The atomic packing factor of a face-centered cubic (FCC) crystal is:
- 0.52
- 0.68
- 0.74
- 0.91
Answer: C. FCC and HCP both have APF = 0.74; BCC is 0.68.
2. Yield strength of a metal without a distinct yield point is usually defined using:
- A 0.2% strain offset
- The ultimate tensile strength
- The fracture point
- The proportional limit at zero strain
Answer: A. The 0.2% offset method draws a line parallel to the elastic slope, offset by 0.002 strain.
3. Toughness of a material is represented on a stress–strain diagram by:
- The slope of the elastic portion
- The yield stress
- The total area under the curve
- The strain at fracture
Answer: C. Toughness is energy absorbed to fracture, the area under the stress–strain curve.
4. In a galvanic corrosion cell, oxidation occurs at the:
- Cathode
- Anode
- Electrolyte
- Salt bridge
Answer: B. Oxidation (metal loss) occurs at the anode; reduction occurs at the cathode.
5. The eutectoid composition of plain-carbon steel is approximately:
- 0.02 wt% C
- 0.77 wt% C
- 2.1 wt% C
- 4.3 wt% C
Answer: B. The eutectoid is ~0.77 wt% C at 727 °C. 4.3 wt% is the eutectic in cast iron.
6. The number of atoms per unit cell in BCC is:
- 1
- 2
- 4
- 6
Answer: B. BCC: 8 corners × 1/8 + 1 center = 2 atoms.
7. Quenching a plain-carbon steel from the austenite region typically produces:
- Pearlite
- Ferrite
- Martensite
- Cementite only
Answer: C. Rapid cooling traps carbon, forming hard, brittle martensite.
8. Creep is best described as:
- Sudden fracture under impact
- Time-dependent deformation under constant load, important at high temperature
- Failure under cyclic loading
- Corrosion in seawater
Answer: B. Creep is slow, time-dependent strain under sustained stress, increasing with temperature.
9. Zinc coating protects steel from corrosion mainly because zinc:
- Is harder than steel
- Acts as a sacrificial anode
- Is a noble metal
- Increases the steel’s strength
Answer: B. Zinc is more active than iron, so it corrodes preferentially, protecting the steel.
10. A plate has a stress concentration factor K_t = 3 at a hole, with nominal stress 100 MPa. The peak stress is:
- 33 MPa
- 103 MPa
- 300 MPa
- 3,000 MPa
Answer: C. σ_max = K_t σ_nom = 300 MPa.
11. Thermoplastic polymers differ from thermosets in that thermoplastics:
- Cannot be reshaped by heating
- Soften when heated and can be reshaped
- Are cross-linked
- Are always brittle
Answer: B. Thermoplastics soften on heating and harden on cooling reversibly; thermosets are cross-linked and do not remelt.
12. A ductile material is characterized by:
- Little plastic deformation before fracture
- Large plastic deformation before fracture
- No yield point
- Low toughness
Answer: B. Ductile materials deform plastically a great deal before failure; brittle ones do not.