← All topics · Civil

Surveying

Leveling, traverses, bearings, horizontal and vertical curves, areas, earthwork. approx. 6–9%

About 5 min read · 12 sections

Overview

Surveying measures distances, angles and elevations to locate points and compute areas and volumes. FE problems are short computations: leveling arithmetic, bearing and azimuth conversions, traverse closure, horizontal and vertical curves, and areas by coordinates. Learn the definitions precisely.

1. Leveling

Differential leveling transfers elevation with a level and rod.

HI = Elev (known point) + BS, Elev (new point) = HI − FS

A backsight (BS) is a reading on a point of known elevation; a foresight (FS) is a reading on a new point. A turning point links one instrument setup to the next.

Level run

Given: BM elevation 100.00 ft. Readings: BS 5.20 on the BM, FS 3.80 on turning point TP1, BS 4.10 on TP1, FS 6.30 on point A.

Solution: HI₁ = 105.20; TP1 = 101.40. HI₂ = 101.40 + 4.10 = 105.50; A = 105.50 − 6.30 = 99.20 ft.

Check a level run by closing back on the starting benchmark; the misclosure should be small compared with the allowable error, which scales with the square root of the distance.

2. Directions: azimuth and bearing

An azimuth is measured clockwise from north, 0° to 360°. A bearing is an acute angle from north or south toward east or west. Convert by quadrant:

QuadrantAzimuth from bearing
NEbearing
SE180° − bearing
SW180° + bearing
NW360° − bearing

The back azimuth is the azimuth ± 180°. The interior angles of a closed n-sided polygon sum to (n − 2)·180°.

3. Traverse computations

For a course of length L and azimuth A:

Latitude = L cos A (north +), Departure = L sin A (east +)

For a closed traverse the sums of latitudes and departures should be zero. The leftovers give the linear error of closure and the relative precision:

E = √(ΣLat² + ΣDep²), precision = 1 : (Perimeter / E)

The compass rule distributes errors in proportion to course length: correction = −(error)(course length)/(perimeter).

Compass rule

Given: the total latitude error is +0.40 ft and the perimeter is 2,000 ft. Find the latitude correction for a 500 ft course.

Solution: correction = −0.40(500/2000) = −0.10 ft.

4. Area by coordinates

A = ½ | Σ (xᵢ yᵢ₊₁ − xᵢ₊₁ yᵢ) |

List the corners in order around the parcel, repeat the first at the end, multiply and subtract. The result is independent of where the origin is placed.

5. Horizontal curves

A simple circular curve is defined by its radius R and deflection angle Δ.

T = R tan(Δ/2), L = R Δ (rad), LC = 2R sin(Δ/2)
E = R [sec(Δ/2) − 1], M = R [1 − cos(Δ/2)]

Using the arc definition the degree of curve is D = 5729.58/R. Stationing: PC = PI − T and PT = PC + L.

Circular curve

Given: R = 1,000 ft, Δ = 30°.

Solution: T = 1000 tan 15° = 267.95 ft. L = 1000(0.5236) = 523.6 ft. LC = 2000 sin 15° = 517.6 ft. E = 1000(sec 15° − 1) = 35.3 ft.

If the PI is at station 25+00, then PC = 2500 − 267.95 = 22+32.05 and PT = 22+32.05 + 523.6 = 27+55.65.

6. Vertical curves

A parabolic curve joins two grades g₁ and g₂ (in percent). The algebraic difference is A = |g₂ − g₁|.

K = L / A elevation: y = y_PVC + g₁x + [(g₂ − g₁)/(2L)] x²

The high or low point is at x = g₁L/(g₁ − g₂) from the PVC when the grades have opposite signs. Larger K means a flatter curve; K is set by design speed and sight distance.

High point

Given: g₁ = +3%, g₂ = −2%, L = 500 ft.

Solution: A = 5, K = 100 ft per percent. High point at x = 0.03(500)/(0.03 + 0.02) = 300 ft from the PVC.

7. Earthwork volumes

Average end area: V = L (A₁ + A₂)/2. Convert cubic feet to cubic yards by dividing by 27. The prismoidal formula is more accurate: V = L (A₁ + 4A_m + A₂)/6, where A_m is the area at the midpoint.

8. Measurement errors

Random errors average out and follow √n behaviour; systematic errors (tape too long, instrument out of adjustment) accumulate and must be corrected. A tape standardized at 68 °F that is used at a higher temperature is too long, so the temperature correction is added.

Common mistakes

  • Subtracting the backsight instead of adding it when computing HI.
  • Forgetting to convert quadrant bearings to azimuths before computing latitudes.
  • Using degrees where radians are required for L = RΔ.
  • Omitting the closing coordinate pair in the area formula.
  • Forgetting to divide by 27 for cubic yards.

Exam strategy

Draw a sketch for every directional problem. For curves, list R, Δ, T, L, PC and PT in order. Use the vertical-curve elevation equation, and sanity-check that the curve elevation lies between the two tangents.

Checklist

  • [ ] I can run and check a differential level.
  • [ ] I can convert between bearings and azimuths.
  • [ ] I can compute traverse closure and apply the compass rule.
  • [ ] I can find horizontal curve elements and stationing.
  • [ ] I can find vertical curve elevations and high and low points.