Overview
Transportation engineering covers geometric design of roads, traffic flow and capacity, signal timing, pavement design and travel demand. FE questions apply short formulas to speeds, volumes and curves. Be careful with units: speeds in mph, distances in feet.
1. Sight distance
Stopping sight distance is the distance travelled during perception–reaction and braking.
V is the speed in mph, t is the reaction time (2.5 s), f the friction coefficient and G the grade as a decimal (negative on a downgrade).
Stopping sight distance
Given: V = 60 mph, t = 2.5 s, f = 0.35, level road.
Solution: 1.47(60)(2.5) = 220.5 ft and 3600/(30 × 0.35) = 342.9 ft, so SSD = 563 ft.
On a 4% downgrade at 50 mph: 183.8 + 2500/[30(0.35 − 0.04)] = 183.8 + 268.8 = 452.6 ft.
2. Horizontal curves
The side-friction and superelevation relationship:
V is in mph and R in feet. Limit e (about 6–8%) and f (depends on speed) and choose the minimum radius that satisfies both.
Minimum radius
Given: V = 60 mph, e = 0.08, f = 0.12.
Solution: R = 60²/[15(0.20)] = 1,200 ft.
Curve geometry (T, L, PC, PT) is the same as in the Surveying guide.
3. Vertical curves and grades
Rise = grade × length. A +3% grade over 2,000 ft rises 60 ft. A parabolic curve has K = L/A; crest curves are controlled by stopping sight distance and sag curves by headlight distance and comfort.
4. Traffic flow
Three basic variables: flow q (veh/h), density k (veh/mi) and space-mean speed v (mph).
The Greenshields model assumes speed falls linearly with density.
Greenshields
Given: v_f = 60 mph, k_j = 120 veh/mi.
Solution: at k = 30, v = 60(0.75) = 45 mph and q = 1,350 veh/h. The maximum flow is 60(120)/4 = 1,800 veh/h at k = 60.
Peak-hour factor: PHF = V/(4 V₁₅). Design hourly volume: DDHV = AADT × K × D, where K is the design-hour fraction and D the directional split.
Design volume
Given: AADT = 20,000, K = 0.10, D = 0.6.
Solution: DDHV = 20,000(0.10)(0.6) = 1,200 veh/h.
5. Capacity and level of service
Level of service (LOS) grades operation from A (free flow) to F (breakdown) based on density, delay or speed. The volume-to-capacity ratio is v/c; above 1.0 the demand exceeds capacity and queues form.
6. Traffic signals
Webster's equation gives the cycle length that minimizes delay:
L is the total lost time per cycle and Y the sum of the critical flow ratios. Green time is split in proportion to the critical flow ratios. Yellow plus all-red intervals provide clearance.
Optimum cycle
Given: L = 12 s, Y = 0.6.
Solution: C = (18 + 5)/0.4 = 57.5 s.
7. Pavement design
Flexible pavements carry load through layers and are designed using the cumulative equivalent single-axle loads (ESALs). Each truck passage is converted using a load equivalency (truck) factor.
ESALs
Given: 500 trucks per day, truck factor 0.8, 20-year life, no traffic growth.
Solution: 500 × 365 × 0.8 = 146,000 ESAL/yr, so 2.92 million over 20 years.
Rigid pavements use concrete slabs with joints and dowels. Subgrade strength (CBR or resilient modulus) controls required thickness.
8. Planning and safety
The four-step travel-demand model: trip generation, trip distribution, mode choice and route assignment. Trip generation uses rates such as 9.5 trips per 1,000 ft² of floor area; 40,000 ft² produces 380 trips. Crash analysis identifies hazardous locations with crash rates per million vehicle-miles.
Common mistakes
- Using speeds in ft/s in an equation written for mph.
- Forgetting the sign of the grade in SSD.
- Using the daily volume instead of the peak-hour volume for capacity.
- Mixing density and flow (q = kv).
- Using total cycle length without subtracting lost time when splitting green.
Exam strategy
Write the units under each symbol before substituting. For traffic questions, identify which of q, k and v are given. A quick check: the maximum flow on a freeway lane is on the order of 2,000 veh/h.
Checklist
- [ ] I can compute stopping sight distance with grades.
- [ ] I can relate superelevation, friction, speed and radius.
- [ ] I can apply q = kv, the Greenshields model, PHF and DDHV.
- [ ] I can find the Webster cycle length.
- [ ] I can compute ESALs and trip generation.